CLEANUP AND ABATEMENT ORDER NO. R5-2004-0706 5 <br />COUNTY OF SAN JOAQUIN AND FOOTHILL SANITARY LANDFILL, INC. <br />CALAVERASCOUNTY 0 <br />discharge from the Foothill Sanitary Landfill facility, in accordance with the scope and schedule set <br />forth below.' <br />By 31 August 2004, the Discharger shall submit a Project Design Report, which shall contain, <br />but not be limited to, a general description of the proposal to eliminate the release of LFG <br />from Module "I" (the "Project"), the details of the proposed barrier between Module "I" <br />(unlined) and Module I (new expansion) refuse, the conceptual LFG collection system for <br />Module "I," additional groundwater monitoring wells, and intermediate cover for the <br />sideslopes for all modules in compliance with WDRs and the minimum standards set forth in <br />Title 27 CCR. <br />By 21 September 2004, the Discharger shall submit a Landfill Closure Method Selection <br />Report, which shall include, but not be limited to, the proposed closure method for the crest of <br />Module "I," including the performance demonstration for alternative covers, in compliance <br />with WDRs and the minimum standards set forth in Title 27 CCR. <br />3, By 16 November 2004, the Discharger shall submit a Partial Cover, Intermediate Cover and <br />Drainage and Erosion Control Plan for surfaces that have reached final elevations or which <br />are not at final elevations, but which will not receive refuse within 180 days for intermediate <br />cover and two years for partial cover as described in the WDRs, in compliance with the <br />minimum standards set forth in Title 27 CCR. <br />4. By 1 February 2005, the Discharger shall submit a Preliminary Closure and Post Closure <br />Maintenance Plan, which shall include the area(s) to be closed (e.g., crest of Module "I"), <br />details of the landfill gas collection system and associated cost estimates, and closure/post <br />closure maintenance cost estimates to determine funding for the financial assurance <br />mechanism, in compliance with WDRs and the minimum standards set forth in Title 27 CCR. <br />By 14 June 2005, the Discharger shall submit the Partial Final Closure Plan, which shall <br />include details of the closure activities for the "crest" of Module "I" as identified in the <br />approved Preliminary Closure and Post Closure Maintenance Plan, in compliance with <br />WDRs and the minimum standards set forth in Title 27 CCR. <br />By 6 September 2005, the Discharger shall submit a Construction Specifications and <br />Construction Quality Assurance/Quality Control Plan, which shall include, but not be limited <br />to construction specifications and construction quality assurance/quality control details for <br />each Component of the Project as follows: <br />Final closure of the crest of Module "I"; <br />Partial and intermediate Cover; <br />I The schedule is derived from a schedule proposed by the Discharger, which is part of the record for this Order and <br />includes assumptions regarding timelines for necessary review and approvals by third party agencies. Delays in those <br />reviews and approvals, to the extent unrelated to acts or omissions by the Discharger, shall constitute good cause for <br />modification of the schedule in this Order. 0 <br />