Laserfiche WebLink
SUMMARY OF BIDS OPENED April 01, 2009 at 2:30 P.M. <br />Stanislaus County Fink Road Landfill <br />Landfill 2, Cell No. 5, Construction Project <br />CdDooumants and Setlingsycrcmy.baugh\DuktoplFrrsno\Other BidslSummoryciv - Fink.xlsx <br />Page 2 of 2 <br />Teiehert <br />Construed.. <br />Raminha Construction, <br />Inc. <br />Whitaker <br />Contractor lne <br />Sierra Equipment <br />Rental, Inc. <br />Granite Construction <br />Co. <br />Unit of <br />Estimated <br />Item Price <br />Total <br />It.. Price <br />Total <br />Item Price <br />Total <br />Item Price <br />Total <br />Item Price <br />Total <br />Item No. <br />Item <br />Measure <br />Quantity. <br />(Figures) <br />(Figures) <br />(Figures) <br />(Figures) <br />(Figures) <br />(Figures) <br />(FI ures <br />g ) <br />(Figures) <br />(Figures) <br />(Figures) <br />1 <br />Mobilization and Demobilization <br />LS <br />1 <br />$441,000.00 <br />$441,000.00 <br />$400,000.00 <br />$400,000.00 <br />$280,000.00 <br />$280,000.00 <br />$220,000.00 <br />$220,000.00 <br />$231,000.00 <br />$231,000.00 <br />2 <br />Layout of Work and Surveys <br />LS <br />? <br />$100,000.00 <br />$100,000.00 <br />$40,000.00$40.000.00 <br />$22,000.00 <br />$22,000.00 <br />$30,000.00 <br />$30,000.00 <br />$24,000.00 <br />$24,000.00 <br />3 <br />Earlhfi8 <br />CY <br />1,700 <br />$3.00 <br />$5,100.00 <br />$5.00 <br />$8,500.00 <br />$2.00 <br />$3,400.00 <br />$1.00 <br />$1,700.00 <br />$4.00 <br />$6,800.00 <br />4 <br />Excavation <br />CY <br />1,327,300 <br />$1.15 <br />$1,528,395.00 <br />$1.37 <br />$1,818,401.00 <br />$1.62 <br />$2,150,226.00 <br />$1.75 <br />$2,322,775.00 <br />$2.25 <br />$2,986,425.00 <br />5 <br />Low Permeability Soil layer <br />CY <br />20,600 <br />$2.25$46,350.0() <br />$8.50 <br />$175,100.00 <br />$3.40 <br />$70,040.00 <br />- $7.50 <br />$154,500.00 <br />$2.00 <br />$41,200.00 <br />6 <br />Subgrade Preparation <br />SF <br />785,500 <br />$0.10 <br />$78,550.00 <br />$0.02 <br />$15,710.00 <br />$0.12 <br />$94,260.00 <br />$0.25 <br />$196,375.00 <br />$0.12 <br />$94,260.00 <br />7 <br />(S)GeosynlheUc Clay liner <br />SF <br />1324,700 <br />$0.74 <br />$610,278.00 <br />$O.fi7 <br />$552,549.00 <br />$0.69 <br />$569,043.00 <br />$0.62 <br />$511,314.00 <br />$0.62 <br />$511,314.00 <br />8 <br />(S) 60 mil HOPE Geomembrane <br />SF <br />833,000 <br />$0.56 <br />$466,480.00 <br />$0.51 <br />$424,830.00 <br />$0.53 <br />$441,490.00 <br />$0.48 <br />$399,840.00 <br />$0.48 <br />$399,840.00 <br />9 <br />(S) Georgmposite Drainage layer (S) <br />SF <br />16,100 <br />$0.71 <br />$11,431.00 <br />$0.65 <br />$10,465.00 <br />$0.66 <br />$10,626.00 <br />$0.60 <br />$9,660.00 <br />$0.60 <br />$9,660.00 <br />10 <br />(S) Gaotextlle Filter (S) <br />SF <br />480,000 <br />$0.14 <br />$67,200.00 <br />$9.13 <br />$62,400,00 <br />$0.13 <br />$62,400.00 <br />$0.12 <br />$57,600.00 <br />$0.12 <br />$57,600.00 <br />11 <br />LCRS Drainage Gravel <br />CY <br />8,770 <br />$40,00 <br />$350,800.00 <br />$38.00 <br />$333,260.00 <br />$34.00 <br />$298,18D.00 <br />$40.00 <br />$350,800.00 <br />$40.00 <br />$350,800.00 <br />12 <br />Sump Gravei <br />CY <br />85 <br />$75.00 <br />$8,375.00 <br />$130.00 <br />$11,050.00 <br />$58,00 <br />$4,930.00 <br />$50.00 <br />$4,250.00 <br />$40.00 <br />_$3,400.00 <br />13 <br />Base Operations Layer <br />CY <br />35,700 <br />$2.90 <br />$103,530.00 <br />$7.50 <br />$287,750.00 <br />$3.60 <br />$128,520.00 <br />$3.25 <br />$116,025.00 <br />$1.90 <br />$67,830.00 <br />14A <br />Side Slope Operations layer Stockpiling <br />CY <br />23,600 <br />$1.50 <br />$35,400.00 <br />$4.00 <br />$94,400.00 <br />$0.60 <br />$18,880.00 <br />$1.00 <br />$23,600.00 <br />$1.00 <br />$23,600.00 <br />148 <br />Side Slope Operations Layer Placement <br />CY <br />10,100 <br />$2.25 <br />$22,725.00 <br />$10.00 <br />$101,000.00 <br />$3.20 <br />$32,320.00 <br />$4.00 <br />$40,400.00 <br />$2.25 <br />$22,725.00 <br />15 <br />&inch Olamter SOR 15.5 HPDE Pipe <br />LF <br />1,670 <br />$22.00 <br />$36,740.00 <br />$13.00 <br />$21,710.00 <br />316.00 <br />$26,720.00 <br />$25.00 <br />$41,750.00 <br />$12.00 <br />$20,040.00 <br />18 <br />a-Inch1244 Diameter SDR 17,0 HDPE Pipe <br />LF <br />925 <br />$24.00 <br />$22,200.00 <br />$20.00 <br />$18,500.00 <br />$16.00 <br />$14,800.00 <br />$40.00 <br />$37,000.00 <br />- $17.00 <br />$15,725.00 <br />17 <br />12•Inch Diamter SDR 15.5 HPOE Pipe <br />LF <br />_TF <br />350 <br />$70.00 <br />$24,500.00 <br />$38,00 <br />$13,300.00 <br />$48.00 <br />$16,800.00 <br />$100.00 <br />535,000.00 <br />$52.00 <br />$18,200.00 <br />18 <br />18 -Inch Diamter SDR 15.5 HPDE Pipe <br />180 <br />$90.00 <br />$18,200.00 <br />$67.00 <br />$12,060.00 <br />$84.00 <br />$15,120.00 <br />$150.00 <br />$27,000.00 <br />$90,00 <br />$16,200.00 <br />19 <br />24 -Inch Diameter CMP <br />LF <br />350 <br />$60.00 <br />$21,000.00 <br />346.00 <br />$16,100.00 <br />$88.00 <br />$30,800.00 <br />$60.00 <br />$21,000.00 <br />$80.00 <br />$28,000.00 <br />20 <br />3 -foot Diameter SOR 17.0 HDPE Manhole <br />EA <br />1 <br />$6,500.00 <br />$6,500.00 <br />$5,000.00 <br />$5,000,00 <br />.$4,000.00 <br />$4,000.00 <br />$5,000.00 <br />$5,000.00 <br />$2.500.00 <br />$2,500.00 <br />21 <br />Expose and Prepare Existing Geomembrane Liner <br />LF <br />2,550 <br />$5.00 <br />$12,750.00 <br />$8.00 <br />$20,400.00 <br />$5.50 <br />$14,025.00 <br />$10.00 <br />$25,500.00 <br />$4.00 <br />$10,200.00 <br />22 <br />Perimeter and Side Slope Anchor Trenches <br />LF <br />3.350 <br />$15.00 <br />$50,250.00 <br />$7.00 <br />$23,450.00 <br />$7.20 <br />$24,120.00 <br />$15,00 <br />$50,250.00 <br />$18.00 <br />$60,300.00 <br />23 <br />(S) Underground Electrical Conduit and Wiring <br />LS <br />1 <br />$65,000.00 <br />$65,000.00 <br />$20,000.00 <br />$20,000.00 <br />$13,000.00 <br />$13,000.00 <br />$125,000.00 <br />$125,000.00 <br />$65,000.00 <br />$65,000.00 <br />24 <br />(S) Electrical Connections and Pumps <br />LS <br />1 <br />$60,000.00 <br />$60,000.00 <br />$20;000.00 <br />$20.000.00 <br />$16,000.00 <br />$16,000.00 <br />$15,000.00 <br />$15,000.OD <br />$60,000.00 <br />$60,000.00 <br />25 <br />Concrete Spill Prevention Pads <br />EA <br />1 <br />$2,000.00 <br />$2,000.00 <br />$7,500.00 <br />$7,500.00 <br />$7,000.00 <br />$7,000.00 <br />$1,500.00 <br />$1,500,00 <br />$3.000.00 <br />$3,000.00 <br />26 <br />(S) Leak Location Survey <br />FJi <br />1 <br />$26,400.00 <br />$28,400.00 <br />$16,500.00 <br />$16,500.00 <br />$19,000.00 <br />$19,000.00 <br />$15,000.00 <br />$15,000.00 <br />$20.000.00 <br />$20,000.00 <br />27 <br />RBvegetailOnMydroseeding <br />AC <br />68 <br />$1,500.00 <br />$102,000.00 <br />$1,25000 <br />$85,000.00 <br />$1,410.00 <br />595,880.00 <br />$1,620.00 <br />$110,160.00 <br />$1,200.00 <br />$81,600.00 <br />28 <br />Slit Fence <br />LF <br />7,100 <br />$2.30 <br />$16,330.00 <br />$2.00 <br />$14,200.00 <br />$2.20 <br />$15,620.00 <br />$3.00 <br />$21,300.00 <br />$1.10 <br />37,810.00 <br />29 <br />pass 2 Road base <br />CY <br />200 <br />$50.00 <br />$10,000.00 <br />$40.00 <br />$8,000.00 <br />$54.00 <br />$10,800.00 <br />$50,00 <br />$10,000.00 <br />$40.00 <br />$8,000.00 <br />30 <br />Selective Oemolltlon <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />$3,000.00 <br />$3,000.00 <br />$5,500.00 <br />$5,500.00 <br />35,000.00 <br />$5,000.00 <br />$5,000.00 <br />35,000.00 <br />31 <br />Ditch Excavation <br />LF <br />4,500 <br />$4.00 <br />$18,000.00 <br />$2.00 <br />$9,000.00 <br />$2.50 <br />$11,250.00 <br />$3.25 <br />$14,625.00 <br />$2.00 <br />$9,000.00 <br />32 <br />Rlp Rap <br />LS <br />1 <br />$8,000.00 <br />$8,000.00 <br />$3,500.00 <br />$3,500.00 <br />55,000.00 <br />$5,000.00 <br />$2,500.00 <br />$2,500.00 <br />56,300.00 <br />$6,000.00 <br />33 <br />Stonnwater Pollution Prevention Plan <br />LS <br />1 <br />$7,500.00 <br />$7,500.00 <br />$8,500.00 <br />$8,500.0 <br />$22,000.00 <br />$22,000.00 <br />$5,000.00 <br />$5,000.00 <br />$2,000.00 <br />$2,000.00 <br />34 Abandonment <br />of Existing Groundwater Monitoring <br />LS <br />1 <br />$7,500.00 <br />$7,500.00 <br />$5,500.00 <br />$5.500.00 <br />$6,900.00 <br />$6,900.00 <br />$15,000.00 <br />$15,000.00 <br />$7,000.00 <br />$7,000.00 <br />Welts 10 and 11 <br />35 Installation <br />of Groundwater Monitoring Wells 25 and <br />LF <br />130 <br />$100,00 <br />$13,000.00 <br />$75.00 <br />$9,750.00 <br />$87.00 <br />$11.310.00 <br />$65.00 <br />$8,450.00 <br />$120.00 <br />$15,600.00 <br />26 <br />36 Transport <br />of Water <br />1,000 gal <br />13,500 <br />$1.00 <br />$13,500.00 <br />$14.00 <br />$189,000.00 <br />- $22.00 <br />$297,000.00 <br />$0.50 <br />$6,750.00 <br />$10.00 <br />-S135 000.00 <br />units <br />units <br />$4,415,984.00 <br />$4,845,385.00 <br />$4,868,960.00 <br />$5,036,624.00 <br />$5,427629.00 <br />CdDooumants and Setlingsycrcmy.baugh\DuktoplFrrsno\Other BidslSummoryciv - Fink.xlsx <br />Page 2 of 2 <br />