SUMMARY OF BIDS OPENED April 01, 2009 at 2:30 P.M.
<br />Stanislaus County Fink Road Landfill
<br />Landfill 2, Cell No. 5, Construction Project
<br />CdDooumants and Setlingsycrcmy.baugh\DuktoplFrrsno\Other BidslSummoryciv - Fink.xlsx
<br />Page 2 of 2
<br />Teiehert
<br />Construed..
<br />Raminha Construction,
<br />Inc.
<br />Whitaker
<br />Contractor lne
<br />Sierra Equipment
<br />Rental, Inc.
<br />Granite Construction
<br />Co.
<br />Unit of
<br />Estimated
<br />Item Price
<br />Total
<br />It.. Price
<br />Total
<br />Item Price
<br />Total
<br />Item Price
<br />Total
<br />Item Price
<br />Total
<br />Item No.
<br />Item
<br />Measure
<br />Quantity.
<br />(Figures)
<br />(Figures)
<br />(Figures)
<br />(Figures)
<br />(Figures)
<br />(Figures)
<br />(FI ures
<br />g )
<br />(Figures)
<br />(Figures)
<br />(Figures)
<br />1
<br />Mobilization and Demobilization
<br />LS
<br />1
<br />$441,000.00
<br />$441,000.00
<br />$400,000.00
<br />$400,000.00
<br />$280,000.00
<br />$280,000.00
<br />$220,000.00
<br />$220,000.00
<br />$231,000.00
<br />$231,000.00
<br />2
<br />Layout of Work and Surveys
<br />LS
<br />?
<br />$100,000.00
<br />$100,000.00
<br />$40,000.00$40.000.00
<br />$22,000.00
<br />$22,000.00
<br />$30,000.00
<br />$30,000.00
<br />$24,000.00
<br />$24,000.00
<br />3
<br />Earlhfi8
<br />CY
<br />1,700
<br />$3.00
<br />$5,100.00
<br />$5.00
<br />$8,500.00
<br />$2.00
<br />$3,400.00
<br />$1.00
<br />$1,700.00
<br />$4.00
<br />$6,800.00
<br />4
<br />Excavation
<br />CY
<br />1,327,300
<br />$1.15
<br />$1,528,395.00
<br />$1.37
<br />$1,818,401.00
<br />$1.62
<br />$2,150,226.00
<br />$1.75
<br />$2,322,775.00
<br />$2.25
<br />$2,986,425.00
<br />5
<br />Low Permeability Soil layer
<br />CY
<br />20,600
<br />$2.25$46,350.0()
<br />$8.50
<br />$175,100.00
<br />$3.40
<br />$70,040.00
<br />- $7.50
<br />$154,500.00
<br />$2.00
<br />$41,200.00
<br />6
<br />Subgrade Preparation
<br />SF
<br />785,500
<br />$0.10
<br />$78,550.00
<br />$0.02
<br />$15,710.00
<br />$0.12
<br />$94,260.00
<br />$0.25
<br />$196,375.00
<br />$0.12
<br />$94,260.00
<br />7
<br />(S)GeosynlheUc Clay liner
<br />SF
<br />1324,700
<br />$0.74
<br />$610,278.00
<br />$O.fi7
<br />$552,549.00
<br />$0.69
<br />$569,043.00
<br />$0.62
<br />$511,314.00
<br />$0.62
<br />$511,314.00
<br />8
<br />(S) 60 mil HOPE Geomembrane
<br />SF
<br />833,000
<br />$0.56
<br />$466,480.00
<br />$0.51
<br />$424,830.00
<br />$0.53
<br />$441,490.00
<br />$0.48
<br />$399,840.00
<br />$0.48
<br />$399,840.00
<br />9
<br />(S) Georgmposite Drainage layer (S)
<br />SF
<br />16,100
<br />$0.71
<br />$11,431.00
<br />$0.65
<br />$10,465.00
<br />$0.66
<br />$10,626.00
<br />$0.60
<br />$9,660.00
<br />$0.60
<br />$9,660.00
<br />10
<br />(S) Gaotextlle Filter (S)
<br />SF
<br />480,000
<br />$0.14
<br />$67,200.00
<br />$9.13
<br />$62,400,00
<br />$0.13
<br />$62,400.00
<br />$0.12
<br />$57,600.00
<br />$0.12
<br />$57,600.00
<br />11
<br />LCRS Drainage Gravel
<br />CY
<br />8,770
<br />$40,00
<br />$350,800.00
<br />$38.00
<br />$333,260.00
<br />$34.00
<br />$298,18D.00
<br />$40.00
<br />$350,800.00
<br />$40.00
<br />$350,800.00
<br />12
<br />Sump Gravei
<br />CY
<br />85
<br />$75.00
<br />$8,375.00
<br />$130.00
<br />$11,050.00
<br />$58,00
<br />$4,930.00
<br />$50.00
<br />$4,250.00
<br />$40.00
<br />_$3,400.00
<br />13
<br />Base Operations Layer
<br />CY
<br />35,700
<br />$2.90
<br />$103,530.00
<br />$7.50
<br />$287,750.00
<br />$3.60
<br />$128,520.00
<br />$3.25
<br />$116,025.00
<br />$1.90
<br />$67,830.00
<br />14A
<br />Side Slope Operations layer Stockpiling
<br />CY
<br />23,600
<br />$1.50
<br />$35,400.00
<br />$4.00
<br />$94,400.00
<br />$0.60
<br />$18,880.00
<br />$1.00
<br />$23,600.00
<br />$1.00
<br />$23,600.00
<br />148
<br />Side Slope Operations Layer Placement
<br />CY
<br />10,100
<br />$2.25
<br />$22,725.00
<br />$10.00
<br />$101,000.00
<br />$3.20
<br />$32,320.00
<br />$4.00
<br />$40,400.00
<br />$2.25
<br />$22,725.00
<br />15
<br />&inch Olamter SOR 15.5 HPDE Pipe
<br />LF
<br />1,670
<br />$22.00
<br />$36,740.00
<br />$13.00
<br />$21,710.00
<br />316.00
<br />$26,720.00
<br />$25.00
<br />$41,750.00
<br />$12.00
<br />$20,040.00
<br />18
<br />a-Inch1244 Diameter SDR 17,0 HDPE Pipe
<br />LF
<br />925
<br />$24.00
<br />$22,200.00
<br />$20.00
<br />$18,500.00
<br />$16.00
<br />$14,800.00
<br />$40.00
<br />$37,000.00
<br />- $17.00
<br />$15,725.00
<br />17
<br />12•Inch Diamter SDR 15.5 HPOE Pipe
<br />LF
<br />_TF
<br />350
<br />$70.00
<br />$24,500.00
<br />$38,00
<br />$13,300.00
<br />$48.00
<br />$16,800.00
<br />$100.00
<br />535,000.00
<br />$52.00
<br />$18,200.00
<br />18
<br />18 -Inch Diamter SDR 15.5 HPDE Pipe
<br />180
<br />$90.00
<br />$18,200.00
<br />$67.00
<br />$12,060.00
<br />$84.00
<br />$15,120.00
<br />$150.00
<br />$27,000.00
<br />$90,00
<br />$16,200.00
<br />19
<br />24 -Inch Diameter CMP
<br />LF
<br />350
<br />$60.00
<br />$21,000.00
<br />346.00
<br />$16,100.00
<br />$88.00
<br />$30,800.00
<br />$60.00
<br />$21,000.00
<br />$80.00
<br />$28,000.00
<br />20
<br />3 -foot Diameter SOR 17.0 HDPE Manhole
<br />EA
<br />1
<br />$6,500.00
<br />$6,500.00
<br />$5,000.00
<br />$5,000,00
<br />.$4,000.00
<br />$4,000.00
<br />$5,000.00
<br />$5,000.00
<br />$2.500.00
<br />$2,500.00
<br />21
<br />Expose and Prepare Existing Geomembrane Liner
<br />LF
<br />2,550
<br />$5.00
<br />$12,750.00
<br />$8.00
<br />$20,400.00
<br />$5.50
<br />$14,025.00
<br />$10.00
<br />$25,500.00
<br />$4.00
<br />$10,200.00
<br />22
<br />Perimeter and Side Slope Anchor Trenches
<br />LF
<br />3.350
<br />$15.00
<br />$50,250.00
<br />$7.00
<br />$23,450.00
<br />$7.20
<br />$24,120.00
<br />$15,00
<br />$50,250.00
<br />$18.00
<br />$60,300.00
<br />23
<br />(S) Underground Electrical Conduit and Wiring
<br />LS
<br />1
<br />$65,000.00
<br />$65,000.00
<br />$20,000.00
<br />$20,000.00
<br />$13,000.00
<br />$13,000.00
<br />$125,000.00
<br />$125,000.00
<br />$65,000.00
<br />$65,000.00
<br />24
<br />(S) Electrical Connections and Pumps
<br />LS
<br />1
<br />$60,000.00
<br />$60,000.00
<br />$20;000.00
<br />$20.000.00
<br />$16,000.00
<br />$16,000.00
<br />$15,000.00
<br />$15,000.OD
<br />$60,000.00
<br />$60,000.00
<br />25
<br />Concrete Spill Prevention Pads
<br />EA
<br />1
<br />$2,000.00
<br />$2,000.00
<br />$7,500.00
<br />$7,500.00
<br />$7,000.00
<br />$7,000.00
<br />$1,500.00
<br />$1,500,00
<br />$3.000.00
<br />$3,000.00
<br />26
<br />(S) Leak Location Survey
<br />FJi
<br />1
<br />$26,400.00
<br />$28,400.00
<br />$16,500.00
<br />$16,500.00
<br />$19,000.00
<br />$19,000.00
<br />$15,000.00
<br />$15,000.00
<br />$20.000.00
<br />$20,000.00
<br />27
<br />RBvegetailOnMydroseeding
<br />AC
<br />68
<br />$1,500.00
<br />$102,000.00
<br />$1,25000
<br />$85,000.00
<br />$1,410.00
<br />595,880.00
<br />$1,620.00
<br />$110,160.00
<br />$1,200.00
<br />$81,600.00
<br />28
<br />Slit Fence
<br />LF
<br />7,100
<br />$2.30
<br />$16,330.00
<br />$2.00
<br />$14,200.00
<br />$2.20
<br />$15,620.00
<br />$3.00
<br />$21,300.00
<br />$1.10
<br />37,810.00
<br />29
<br />pass 2 Road base
<br />CY
<br />200
<br />$50.00
<br />$10,000.00
<br />$40.00
<br />$8,000.00
<br />$54.00
<br />$10,800.00
<br />$50,00
<br />$10,000.00
<br />$40.00
<br />$8,000.00
<br />30
<br />Selective Oemolltlon
<br />LS
<br />1
<br />$5,000.00
<br />$5,000.00
<br />$3,000.00
<br />$3,000.00
<br />$5,500.00
<br />$5,500.00
<br />35,000.00
<br />$5,000.00
<br />$5,000.00
<br />35,000.00
<br />31
<br />Ditch Excavation
<br />LF
<br />4,500
<br />$4.00
<br />$18,000.00
<br />$2.00
<br />$9,000.00
<br />$2.50
<br />$11,250.00
<br />$3.25
<br />$14,625.00
<br />$2.00
<br />$9,000.00
<br />32
<br />Rlp Rap
<br />LS
<br />1
<br />$8,000.00
<br />$8,000.00
<br />$3,500.00
<br />$3,500.00
<br />55,000.00
<br />$5,000.00
<br />$2,500.00
<br />$2,500.00
<br />56,300.00
<br />$6,000.00
<br />33
<br />Stonnwater Pollution Prevention Plan
<br />LS
<br />1
<br />$7,500.00
<br />$7,500.00
<br />$8,500.00
<br />$8,500.0
<br />$22,000.00
<br />$22,000.00
<br />$5,000.00
<br />$5,000.00
<br />$2,000.00
<br />$2,000.00
<br />34 Abandonment
<br />of Existing Groundwater Monitoring
<br />LS
<br />1
<br />$7,500.00
<br />$7,500.00
<br />$5,500.00
<br />$5.500.00
<br />$6,900.00
<br />$6,900.00
<br />$15,000.00
<br />$15,000.00
<br />$7,000.00
<br />$7,000.00
<br />Welts 10 and 11
<br />35 Installation
<br />of Groundwater Monitoring Wells 25 and
<br />LF
<br />130
<br />$100,00
<br />$13,000.00
<br />$75.00
<br />$9,750.00
<br />$87.00
<br />$11.310.00
<br />$65.00
<br />$8,450.00
<br />$120.00
<br />$15,600.00
<br />26
<br />36 Transport
<br />of Water
<br />1,000 gal
<br />13,500
<br />$1.00
<br />$13,500.00
<br />$14.00
<br />$189,000.00
<br />- $22.00
<br />$297,000.00
<br />$0.50
<br />$6,750.00
<br />$10.00
<br />-S135 000.00
<br />units
<br />units
<br />$4,415,984.00
<br />$4,845,385.00
<br />$4,868,960.00
<br />$5,036,624.00
<br />$5,427629.00
<br />CdDooumants and Setlingsycrcmy.baugh\DuktoplFrrsno\Other BidslSummoryciv - Fink.xlsx
<br />Page 2 of 2
<br />
|