Laserfiche WebLink
E <br />Foothill Sanitary Landfill Public Works/Solid Waste <br />Preliminary PCPM Plan Page 1 of 4 County of San Joaquin - Revised July 28, 2010 <br />Table 2 <br />Annual Postclosure Maintenance Cost Estimate <br />Foothill <br />Sanitary Landfill <br />San Joaquin County, California <br />Items <br />Quantity <br />Units <br />Unit Cost <br />Subtotals <br />COVER MAINTENANCE <br />1 Soil (replace 6 inches over landfill area) <br />27,100 <br />CY <br />$8.00 <br />$216,800 <br />2 Seeding and Mulching (5% of landfill surface) <br />34 <br />AC <br />$3,000 <br />$101,000 <br />3 Mowing <br />673 <br />AC <br />$200 <br />$134,600 <br />Cover Repair Subtotal <br />............... . . . .. <br />.... ... .. <br />$452,400 <br />LEACHATE COLLECTION <br />4 Operation, Maintenance, Disposal <br />10 <br />EACH <br />$800 <br />$8,000 <br />5 Leachate Sampling <br />10 <br />EACH <br />$400 <br />$4,000 <br />6 Leachate Analysis <br />10 <br />EACH <br />$220 <br />$2,200 <br />Leachate Collection Systems Subtotal <br />........... <br />........... -1 -:,; ;� <br />...... .. . . <br />-$14,200 <br />LFG MONITORING <br />7 Soil Gas Sampling <br />1 <br />LS <br />$6,100 <br />$6,100 <br />8 Soil Gas Analysis <br />1 <br />LS <br />$10,000 <br />$10,000 <br />9 Surface Emission Monitoring <br />1 <br />LS <br />$135,000 <br />$135,000 <br />Perimeter Monitoring Subtotal <br />........ <br />. . . N 1: 10 <br />$151100 <br />LFG CONTROL SYSTEM <br />10 Maintenance and Operation <br />1 <br />LS <br />$772,000 <br />$772,000 <br />LFG System Subtotal <br />I 111111 1 1 1 1 1 <br />$772,000 <br />GROUNDWATER AND SURFACE WATER MONITORING <br />11 Groundwater and Surface Water Sampling <br />1 <br />LS <br />$6,100 <br />$6,100 <br />12 Analysis <br />1 <br />LS <br />$3,500 <br />$3,500 <br />13 Monitoring Well Maintenance <br />1 <br />LS <br />$1,000 <br />$1,000 <br />Groundwater and Surface Water Monitoring Subtotal <br />............. .. <br />........ <br />$10,600 <br />VADOSE ZONE MONITORING <br />14 Vadose zone sampling <br />1 <br />LS <br />$3,800 <br />$3,800 <br />15 Analysis <br />Vadose Zone Monitoring SubtotaW,:,::.11.. <br />1 <br />LS <br />;*1t;;4::::; ...... <br />$4,400 <br />$4,400 <br />$8,200 <br />DRAINAGE <br />See Note 16 <br />1 <br />LS <br />$12,000 <br />$12,000 <br />Drainage Subtotal <br />$12,000 <br />SECURITY <br />See Note 17 <br />1 <br />LS <br />$5,000 <br />$5,000 <br />Security Subtotal <br />$5,000 <br />SETTLEMENT ANALYSIS <br />See Note 18 <br />1 <br />LS <br />$8,000 <br />$8,000 <br />Settlement Analysis- Subtotal <br />$8,000 <br />DECOMMISSIONING <br />See Note 19 <br />1 <br />LS <br />$0 <br />$0 <br />Decommissioning Subtotal <br />........... <br />. . ............ <br />..... <br />. ................... <br />. . .. ...... <br />$0 <br />OTHER <br />20 Inspections and Record Keeping <br />100 <br />Hrs <br />$96 <br />$9,600 <br />Other Subtotal <br />.. ........ <br />. ....... . . <br />$ 9,600 <br />TOTAL ESTIMATED ANNUAL COST <br />$1,443,100 <br />TOTAL COST OVER 30 YEARS <br />$43,293,000 <br />AC= acre <br />CY = cubic yard <br />LS = lump sum <br />All costs are in 2010 dollars. <br />E <br />Foothill Sanitary Landfill Public Works/Solid Waste <br />Preliminary PCPM Plan Page 1 of 4 County of San Joaquin - Revised July 28, 2010 <br />