Laserfiche WebLink
C <br />Groundwater, Vadose, and Surface Water Sampling and Analyses Quantities for <br />Estimating Postclosure Costs <br />Type and Number of <br />Monitoring Facilities <br />Sampling Events <br />Per Year <br />Analysis <br />Per Year <br />Groundwater Wells, 6 Wells at Closure <br />Semi-annually, 12 <br />12 <br />Vadose Stations, 10 Stations at Closure <br />Semi-annually, 20 <br />20 <br />Leachate Sumps, 10 Sumps at Closure <br />Annual, 10 <br />10 <br />Surface Water, 4 Samples Per Year <br />Annually, 4 <br />4 <br />OiSan Joaquin Countyk136605 FoothiIAClosure PC CosIsTH CIO-PostClo Rev 07262010.xis, Samp Oty <br />Foothill Sanitary Landfill Public Works/Solid Waste <br />Preliminary PCPM Plan - Page 4 of 4 County of San Joaquin - Revised July 28, 2010 <br />