Laserfiche WebLink
Vector Engineering, Inc. <br />143E Spring Hill Drive WELL ®11 <br />Grass Valley, CA 95945 Page 1 of 2 <br />Telephone: 530-272-2448 <br />Fax: 530-272-8533 <br />Project: LFG Monitoring Well Installation Remarks: <br />Client: San Joaquin County <br />Location: Foothill Sanitary Landfill I <br />6484 North Waverly Road, Linden, CA <br />rn <br />N <br />jCL Material Description <br />ML SANDY SILT (MLS brown (10YR 4/3), dry, approximately 50 <br />% low plastic fines, 50 % fine-grained sand, some cemented <br />5 sand <br />SC CLAYEY SAND (SCj dark yellowish brown (10YR 4/4) <br />10 moist, approximately 30 % medium plasticity fines, 70 % fine - <br />to medium -grained sand <br />15 1 � -14ft: ce_m_en_te_d_san_d layer (sandstone) _ _ _ _ <br />SM SILTY SAND (SM) dark brown (10YR 3/3), moist, 15 - 20 % J <br />low plastic fines, 80 - 85% fine- to medium -grained sand <br />20 (mostly fine) <br />-some strong to moderately cemented sand layers (sandstone) <br />25 <br />30 <br />--- ----------------T------------------ <br />SC CLAYEY SAND (SCj brown (10YR 4/3), moist, <br />approximately 30 % medium plasticity fines, 70 % fine-grained <br />35 sand, some weak to moderately cemented sand layers from 30 <br />62ft <br />40 - 37ft: same, except approximately 15 % fines, 85 % <br />fine-grained sand <br />-43ft: same, except dark brown (10YR 3/3) <br />45 <br />50 <br />-52ft: same, except approximately 40 % fines, 60 % <br />55 fine-grained sand <br />-thin layers of claystone/siltstone 53 - 62ft <br />60 <br />CL SANDY CLAY (CL) brown (10YR 4/3), moist, approximately <br />65 60 - 70 % medium plasticity fines, 30 - 40 % fine-grained sand, <br />some weakly cemented sand <br />70-- <br />75 <br />:N <br />Well Diagram <br />Cement <br />5 Bentonite <br />Gravel <br />10 filter pack <br />Bentonite <br />1s <br />I <br />35 Gravel <br />filter pack <br />40-- <br />0 <br />0 <br />45 <br />50 <br />55 <br />Bentonite <br />Gravel <br />filter pack <br />Drilling Company: Technicon Date Started: 8/5/2009 Time Started: 1:05pm <br />Drilling Method: Hollow Stem Auger Date Completed: 8/6/2009 Time Completed: 12:05pm <br />Boring Diameter: 8 in Elevation (ft): 266.42 Total Depth (ft): 106 <br />Logged By: Kristin Sample, PE Groundwater Level: NFWE <br />Sampling Method: Grab from cuttings <br />