0 5.4. Cover <br />5.4.1 Cover Materials <br />On-site soil will be used as cover for operations layer, daily cover, intermediate <br />cover and closure (Table 3 and 4). Soil for cover will be excavated from the borrow <br />areas of each module (Figure 5). The on-site soil meets the requirements for <br />operational use at the Landfill as well (Appendix D and E). <br />5.4.2 Cover Frequency <br />Refuse is covered daily. <br />5.4.3 Intermediate Cover <br />Intermediate cover is placed on surfaces that are not scheduled to receive refuse for <br />180 days. In the recent past, this requirement applies to the outside slopes of <br />Module 1. Surfaces of Module "I" received cover in excess of intermediate cover in <br />the Site Improvement Project of 2006. <br />5.4.4 Alternate Daily Cover <br />Foothill Landfill may deploy tarps as alternate daily cover (ADC). If used, the tarps <br />would be removed from the surface of the working area at the beginning of each <br />work day, and placed over the new refuse lift at the end of the day. <br />When tarps are used, refuse would be spread in lifts approximately two feet thick in <br />an area of approximately 100 feet x 90 feet, or other dimension appropriate for the <br />tarp or other cover. <br />5.4.5 Beneficial Reuse <br />Beneficial reuse at the site includes use of inert materials (demolition debris, etc) for <br />the construction of roads and winter pads. <br />Foothill Sanitary Landfill Page 22 Of 57 Public Works/Solid Waste <br />Joint Technical Document County of San Joaquin — Revised 7/30/10 <br />