Laserfiche WebLink
Shaw Environ 1 <br /> GROUNDWATER SAMPLING QUEST ORM <br /> PROJECT NAME: Foothill Landfill <br /> SCHEDULED DATE: January 202 <br /> SPECIAL INSTRUCTIONS/CONSII)I- TIONS: Project gr: JC Isham <br /> First Semester(1st Qtr)2012 Monitoring vent ` S cto Dir P 916-565-4316 <br /> Lysimeters. Concor Dir: 925-288-2381 <br /> Proje t No.: 139867.1300 <br /> Apply vacuum 24-hr prior to sample attem t. �n pler: Paul Weinhardt <br /> Ce Phone: 530-391-4037 <br /> Well Lock <br /> Number(s) <br /> 0464 <br /> #18 in caddy <br /> Site Contact: Jess Padilla 209-887-3969 <br /> Well Number Casing Casing Depth to <br /> or Source Diameter Length Water ANALYSES REQUESTED <br /> (inches) (feet) (feet) <br /> 8/10/2011 <br /> LZ-01 NIA N/A No sample IDS,Chloride,Alkalinity(carb/bicarb) <br /> Nitrate-Nitrogen(48-hr hold time) <br /> LZ-02 N/A N/A No sample Sulfate <br /> Metals: Ca,Mg,K,Na(NOT FILTERED) <br /> LZ-03 N/A No sample VOCs by 8260B <br /> i <br /> LZ-04 N/A / N/A No sample Field Measurements: <br /> pH,EC <br /> �v <br /> Jx <br /> Laboratory and Lab QC Instructions <br /> BC Labs-Tina Green Please report MDL's,PQL's and Trace. <br /> 4100 Atlas Court <br /> Bakersfield,Ca 93308 BC Lab Courier Ross Dickey: 661-201-4171 <br /> 661-3274911/Fx:327-1918 <br /> Ship via UPS Acct 965376 <br /> Field Support Peter Bins (408)391-2942 <br /> Ft Hill SA 1&3 Page 3 of 3 <br />