My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:42:29 AM
Creation date
7/3/2020 10:45:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Permits to drill and install groundwater monitoring wells will be obtained by the <br /> County from San Joaquin County Environmental Health Department (EHD). The <br /> Engineer will provide the Contractor a copy of the approved permit. <br /> 1.04 INSPECTION <br /> A. For the purpose of this section, installation refers to placing material in a <br /> borehole. Well Installation does not include drilling the borehole. <br /> B. Installation of groundwater wells shall be in the presence of EHD inspectors. <br /> C. The Engineer will be in charge of scheduling well installation inspections with <br /> EHD. Contractor shall not coordinate any inspections with the EHD unless <br /> authorized by the Engineer. <br /> D. EHD inspection hours are from 9.00 a.m. to 4.00 p.m. each working day. Well <br /> installation shall be during EHD's inspection hours. <br /> E. Contractor shall provide the Engineer three days' notice for well installation. <br /> Engineer will provide two days' notice to EHD. <br /> 1. Contractor shall confirm with the Engineer the approximate time <br /> Contractor's crew will be ready for the first inspection for a project before <br /> 24 hours. <br /> 2. Contractor shall confirm consecutive inspections needed for the project <br /> with the Engineer in the field based on the work progress after the first <br /> inspection. The Engineer will then schedule inspections.with EHD <br /> inspector. <br /> PART 2 PRODUCTS <br /> 2.01 GENERAL <br /> All materials shall be new and free of defects. Contractor shall inspect materials <br /> before installing. Contractor shall replace defective materials at no additional <br /> cost to the County. <br /> 2.02 WELL CASING <br /> The well casing shall be schedule 80, flush-threaded polyvinylchloride (PVC). <br /> On-Call Driller RFB 6820 San Joaquin County <br /> Groundwater Monitoring Well Specifications 2 Public Works Dept <br /> Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.