DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 013 <br />Project Number: 11-101-01 Date: Thursday 05/28/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: T. Sathees <br />Contractor: R J Gordon Construction, Inc. <br />Weather: Clear Wind: 0-10 mph. <br />Tem erature: Approx. range 60-85 F Other: <br />The contractor worked from 7:00 am to 5:30 pm. <br />Excavation: 7:00 am to 5:30 pm. Up to (2) CAT D6 and (1) CAT D8 dozers with ripper attachments assisted up to (4) CAT 627 <br />and (2) CAT 637 scrapers load material from the excavation along northwest and east sides of the cell. The soil was hauled <br />and stockpiled at North West Stockpile for use as daily cover for active landfill operations, to South Stockpile 2 for use as <br />Operations layer soil, and to Earthfill construction along south side and east side (upper bench) of the Cell. The soil was <br />hauled on an approximate 5 -min cycle. (1) CAT 627 scraper went idle in the afternoon. <br />(1) CAT 14H motorgrader trimmed the upper slopes along north side of the cell. <br />North West Stockpile: 7:00 am to 5:30 pm. (1) CAT 14H motorgrader was observed spreading and grading the soil in the <br />stockpile fill areas and maintaining haul roads. (1) CAT 621 water pull was used to maintain fill areas and haul roads. <br />South Stockpile 1 (Fdn. Stk.): No activity was observed. <br />South Stockpile 2 (Ops. Stk.): 7:00 am to 5:30 pm. The scrapers hauled the relatively sandy materials from upper slopes <br />along northeast and east side of the cell and stockpiled for use as Operations Layer soil. (1) CAT D6 dozer spread the material <br />to help break the big clods. Two composite samples were obtained, and the fines content were 26 and 29 % of the portion <br />finer that 3/8 -inch. (1) CAT 14H motorgrader was observed spreading and grading the soil in the stockpile fill areas and <br />maintaining haul roads. (1) CAT 621 water pull was used to maintain fill areas and haul roads. <br />Access Road Embankment Fill (Earthfill): No activity was observed. <br />Subgrade Earthfill along South side and east side (Upper Bench) of the Cell: 7:00 pm to 5:30 pm. (1) CAT 621 water pull <br />moisture -conditioned the Earthfill. (1) CAT 825 compactor was used to break the big clods and to compact the Earthfill. The <br />scrapers hauled the material from the excavation areas and placed Earthfill. Density testing on the Earthfill indicated <br />compliance with the specifications. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water pull, <br />(4) CAT 627 scrapers, (3) CAT 637 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />