Laserfiche WebLink
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 007 <br />Project Number: 11-101-01 Date: Tuesday 05/19/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: T. Sathees <br />Contractor: R J Gordon Construction, Inc. <br />Weather: Partly cloudy Wind: 0-10 mph. <br />Temperature: Ap2rox. range 55-85 F Other: <br />The contractor worked from 7:00 am to 5:30 pm. <br />Excavation: 7:00 am to 5:30 pm. Up to (1) CAT D6 and (1) CAT D8 dozers with ripper attachments assisted up to (4) CAT 627 <br />and (2) CAT 637 scrapers load material from the excavation along north side of the cell. The sandy soil mixed with top <br />organic soils was hauled and stockpiled at North West Stockpile for use as daily cover for current landfill operations. The fine- <br />grained soil (brown silty sand) was hauled to the South Stockpile for use as foundation layer material. The soil was hauled to <br />the stockpiles on an approximate 5 -min cycle. (1) CAT 14H motorgrader was observed part time fine grading the upper <br />portion of north slope of the cell. <br />In the morning, the CAT D6 dozer also removed the vegetation and topsoil at east side of the cell (upper slopes) and piled the <br />soil for future hauling. <br />North West Stockpile: 7:00 am to 5:30 pm. (1) CAT 14H motorgrader was observed part time spreading and grading the <br />soil in the Stockpile fill areas, and maintaining haul roads. (1) CAT 621 water pull was used to maintain fill areas, haul roads, <br />and excavation areas. <br />South Stockpile (Fdn. SUL): 7:00 am to 5:30 pm. The fine-grained brown silty sand material was hauled from the excavation <br />to the South Stockpile for use as foundation layer material. One sample was tested and the fines content of the stockpiled <br />material was 39 percent of the portion finer that 3/8 -inch. <br />Access Road Embankment Fill (Earthfill): 7:00 am to 5:30 pm. In the morning, (1) CAT 825 compactor scarified and re - <br />compacted the existing subgrade. (2) CAT 627 scrapers hauled the brown silty sand material from the excavation areas and <br />placed thin lifts. (1) CAT 621 water pull moisture -conditioned the native subgrade and Earthfill. The CAT 825 compactor was <br />used to compact the Earthfill. Density testing on the Earthfill indicated compliance with the specifications. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T dozer, (1) CAT 621G water pull, (6) CAT 627 scrapers, (3) CAT 637 <br />scrapers, (1) 14H motorgrader, (1) CAT 825H compactor <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />v <br />