My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: OS4 <br />Project Number: 14-101-01 Date: Friday 07/24/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: Jude A <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear Wind: 0-10 mph. <br />Tem erature: A22rox. range 70- 95 F Other: <br />The contractor worked from 5:30 am to 4:00 pm. <br />Excavation: (1) CAT D6 dozer graded Basin 1. (1) 4k gallon water truck was used to maintain excavations, haul roads and fill <br />areas. <br />Slope Subgrade Preparation: Up to (6) laborers used hand tools to prepare the slope subgrade for geosynthetic materials. <br />The slope was previously smooth drum rolled and the handwork today was to address deficient areas. <br />Access Road: No activity. <br />Foundation Layer: (1) water -truck and (1) CAT 5413 smooth drum roller maintained the finish surface of foundation layer <br />soil on the floor in advance of geosynthetics placement. <br />Sump Riser Construction: The 24" Secondary riser pipe was welded today. GCL and HDPE liner were placed in the <br />secondary liner trench today. The geomembrane welds were spark tested and the 24" HDPE pipe and the 6" instrumentation <br />pipes were placed in the trench using the CAT 320 excavator, the Hitachi 300 excavator and one CAT extendable forklift. The <br />installation was in conformance with the plans and the secondary liner was not damaged by placement of the pipe. Coarse <br />Gravel was placed around the perforated section of the secondary risers at the toe by the end of the day. The subgrade <br />between the secondary and primary riser trenches did not conform to the grades per Detail 15 on Sheet C-7 as the material <br />when excavated resulted in an irregular blocky surface. CQA discussed the issue with the contractor several times prior to <br />placement of the secondary liner. He stated that the only way for him to be able to repair the subgrade was if the secondary <br />riser pipe and fill were in place. He stated that he would address the grade issues before placing liner on the Subgrade for the <br />primary riser pipe. <br />North West Stockpile: No activity was observed. <br />South Stockpile 2 (Operations): No activity was observed. <br />South Stockpile 3: No activity was observed. <br />Geosynthetic Liner: Geosynthetics detailing and deployment continued on the floor. QA activities included monitoring of <br />placement, trial welds, seaming and collection of destructive seam samples. A cumulative quantity of approximately <br />430,000 SF of GCL and geomembrane has been deployed. <br />Excavate Anchor Trench: (1) CAT 320 excavator finished excavation of the anchor trench at the top of the east slope today. <br />The material was very blocky and fractured. The trench sides were rough following excavation. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T LGP dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water <br />pull, (2) CAT 627 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor, (1) water truck, (1) Hitachi 300 excavator, (1) <br />CAT CS 54B smooth drum roller (vibratory type), (1) CAT TH160B folk lift, (1) CAT 430D backhoe. (1) CAT 320 excavator <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />