My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Taj Bahadori <br />Construction Memorandum #2 <br />14 July 2015 <br />Page 2 <br />Geosyntec O <br />consultants <br />• 60 -mil double sided textured (DST) HDPE GM2 — manufactured by GSE <br />Environmental, Inc.; and <br />• 0.75 -ft thick layer of the proposed GDM. <br />Two (2) 15 -ft wide panels of the GCL (overlapped about 8 in.), overlain by one 23 -ft wide panel of <br />DST HDPE GM, were installed prior to GDM placement. <br />Placement of the GDM was in accordance with the Specifications (i.e., the GDM was piled next <br />to the test pad and pushed over the HDPE GM using a low ground pressure (LGP) D6T dozer). <br />Sixteen (16) passes were made by the dozer while installing the GDM. <br />Once the required thickness of the GDM was placed, the Contractor performed additional 22 passes <br />over the 0.75 -ft thick layer of GDM. Afterwards, the Contractor carefully removed the GDM and <br />Geosyntec personnel visually inspected the HDPE GM for holes, punctures, scratches, etc. <br />The inspection indicated no damage to the HDPE GM. There were no observed holes, punctures, <br />scratches, etc., as a result of the construction loading. Therefore, Geosyntec approves the use of the <br />Cemex 5/16" x 1/8" pea gravel for construction of the Area 2A expansion at the Foothill Sanitary <br />Landfill. During placement of the GDM, equipment loading should be limited to the maximum <br />loading condition applied during this test pad. The CQA Consultant shall monitor GDM placement <br />operations to verify that underlying geosynthetics are not damaged and remain in intimate <br />contact during placement operations. <br />All work performed as part of this construction shall meet the requirements of the project <br />construction drawings and specifications, as modified by relevant construction memoranda. <br />Enclosure — Test Pad Photographs <br />2 The HDPE GM used for the test pad was from a certified roll for this project (Roll #18772). <br />P\SJC\1780\Task 6.1\CM #2 (GDM Test Pad) <br />�`ffmnmi . i <br />
The URL can be used to link to this page
Your browser does not support the video tag.