As-Built CQA Report for the Construction of Area 2A at the Foothill Sanitary Landfill <br /> San Joaquin County,California <br /> tests had been performed and used for previous Module 1 liner for the Foothill <br /> Landfill and also for the North County Landfill Area 4 and 5 composite Liners. <br /> • The tests results for sandwich tests (Test Series 4) confirmed that the specified <br /> post-peak strengths were met at all 5 normal stress points and that the sliding <br /> occurred on the GCL/geomembrane interface. <br /> Side Slope Liner <br /> • The post-peak strengths for the HDPE geomembrane/geocomposite interface for <br /> the side slope liner (Test Series 3) met the minimum specified values at normal <br /> stresses of 6,000, 8,000 and 12,000 psf,but were slightly below the specified values <br /> at normal stresses of 1,000 and 4,000 psf. <br /> • Similar results were also confirmed for sandwich tests for side slope liner (Test <br /> Series 5). <br /> • Geosyntec evaluated the test results and confirmed that these slightly lower post- <br /> peak strengths at 1,000 and 4,000 psf normal stresses had no impact on the <br /> stability analysis. This confirmation is documented in their Construction <br /> Memorandum#3 included in Appendix C.2a. <br /> 6.5 GEOSYNTHETICS INSTALLATION <br /> • 6.5.1 General <br /> The geosynthetics installation for Area 2A Liner started on July 14, 2015 and was completed on <br /> September 25, 2015. The installation initially commenced with GCL on the north slope followed by <br /> 60-mil DST HDPE geomembrane. The liner system was tied in to the existing Area 1 liner. On <br /> completion of the north slope installation, GBE installed GCL and HDPE on the floor and then on the <br /> east slope. Once the liner was completed, a leak location survey was performed on the bare <br /> geomembrane. GBE installed geocomposite on side slopes and GDM on the floor following the leak <br /> location survey. The 8-oz geotextile was installed on top of GDM on the floor prior to placement of <br /> operations layer on the floor and lower 20 feet of the slopes. Another leak location survey was <br /> performed on the completed liner system with the operations layer in place. Side slope liner above <br /> the 20 feet was covered with sacrificial geomembrane. <br /> The configuration for installation on the floor and side slopes followed the configuration tested in <br /> interface strength tests. All of the installation activities were monitored full time by AES CQA <br /> monitors under the supervision of the CQA Manager. <br /> 6.5.2 GCL <br /> GBE installed the GCL on the side slope and floor areas between July 14 and August 3, 2015. The <br /> • GCL was installed on top of prepared subgrade on the side slope or the foundation layer on the <br /> PA14 ProjectW4-101(SJCDPW North County and Foothill)IFoothill CQAIReportlFinal ReportlFoothill CQA Rport-Final.docx <br /> 24 <br />