My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As-Built CQA Report for the Construction of Area 2A at the Foothill Sanitary Landfill <br /> San Joaquin County,California <br /> • 11.0 CERTIFICATION <br /> Construction of the Area 2A composite liner system for the Foothill Sanitary Landfill was started on <br /> May 11, 2015 and substantially completed on October 2, 2015 by R. J. Gordon Construction as <br /> General Contractor with Great Basin Environmental as their Geosynthetics Subcontractor. AES <br /> provided the CQA observation and testing services to the San Joaquin County Department of Public <br /> Works Solid Waste Division during the liner construction to verify compliance with the Plans, <br /> Specifications,the CQA Manual, and any design revisions/variances approved by Geosyntec (Design <br /> Firm) and the County. <br /> Our CQA services included: review of project documents, including Technical Specifications, <br /> Contract Drawings, and CQA Manual; review of MQC documentation for geosynthetics materials; <br /> review of conformance test results of geosynthetics; field observations and testing of all earthwork <br /> and geosynthetic components of liner system; and coordination of the CQA activities with County's <br /> Project Manager and field personnel. Our CQA services did not include direction of Contractor's <br /> activities. <br /> Based on the results of our CQA observation and testing services, and on our review of the MQC <br /> documentation certified by various geosynthetic manufacturers, AES hereby certifies (this <br /> certification represents a professional opinion of judgment) that the construction of Area 2A <br /> • composite liner system for the Foothill Sanitary Landfill was performed in accordance with the <br /> requirements of the Contract Drawings, Specifications and the CQA Manual, and in conformance <br /> with Title 40, Subtitle D CFR and Title 27 CCR. <br /> Prepared by: <br /> ADVANCED EARTH SCIENCES, INC. �CNAL <br /> Reviewed by: ` <br /> IL NCHAML iL RAUB <br /> a Z <br /> N ENGINEERING <br /> GEOLOGIST r 7 <br /> � F <br /> , <br /> Michael Raub, PG, CEG Kris lnani,•,,PEG1 <br /> CQA Manager ��FCAt-�F� Senior Princip ' <br /> Jude Ananthanathan, PE, GE QRoFESS��N <br /> Senior Engineer DRANO,ql <br /> ��v�PN F <br /> w w 2= m <br /> GE 2883 z T <br /> Thevachandran Shenthan, PhD, PE, G <br /> • Associate �oTECHN\oP �P <br /> gTFOF CAI\Fa <br /> PA14 Projects114-101(SJCDPW North County and Foothill)IFoothill CCA epo final ReporWoothill CQA Rport-Final.docx <br /> 38 <br /> f': <br />
The URL can be used to link to this page
Your browser does not support the video tag.