|
1
<br />2
<br />3
<br />4
<br />5
<br />E
<br />7
<br />9
<br />1C
<br />11
<br />12
<br />13
<br />14
<br />15
<br />lE
<br />17
<br />lE
<br />15
<br />2(
<br />21
<br />22
<br />23
<br />24
<br />25
<br />2(
<br />27
<br />2E
<br />2s
<br />3(
<br />31
<br />32
<br />33
<br />34
<br />35
<br />3E
<br />37
<br />3E
<br />35
<br />4(
<br />41
<br />42
<br />4�
<br />44
<br />is 45
<br />4(
<br />PROJECT #:
<br />PROJECT:
<br />LOCATION:
<br />14-101-01
<br />Foothill Landfill - Area 2A
<br />San Joaquin County, CA
<br />MATERIAL TYPE:
<br />DATE OF ARRIVAL:
<br />MATERIAL MANUFACTURER:
<br />PRODUCT IDENTIFICATION:
<br />Geocomposite
<br />7/13/15 through 7/17/15
<br />GSE
<br />FT2-300E-08-0-8E-ON
<br />iof2
<br />CONTRACTOR: Great Basin
<br />DAY/DATE:
<br />SHEET NUMBER 2 Total
<br />INVENTORY MONITOR JA/MH
<br />CONDITION IN TRUCK New
<br />UNLOADING METHOD Forklift
<br />Roll No.
<br />Batch or Lot
<br />No.
<br />Roll Dimensions
<br />Length Width Area
<br />(H� (ft) (ft2)
<br />Date Recd
<br />on site
<br />MQC
<br />Y/N
<br />Conf.
<br />QA I.D. Comments
<br />Sampling?
<br />131465724
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17Z15
<br />Y
<br />MH
<br />131465725
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465726
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465727
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465728
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465729
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465730
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465731
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465732
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465733
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465734
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465735
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465736
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465737
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465738
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465739
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/15/15
<br />Y
<br />MH
<br />131465740
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465741
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465742
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465743
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17115
<br />Y
<br />X MH Conformance OK
<br />131465744
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465745
<br />CFD611202
<br />150
<br />1 15
<br />2,250
<br />7/15/15
<br />7/15/15
<br />Y
<br />MH
<br />131465746 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465747
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465748
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/15/15
<br />7/15Z15
<br />Y
<br />MH
<br />131465749 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465750
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/17/15
<br />Y
<br />MH
<br />131465751
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/15/15
<br />7/15/15
<br />7/15/15
<br />7/15/15
<br />7/15/15
<br />7/15/15
<br />7/15/15
<br />7/15/15
<br />7/15/15
<br />7/15/15
<br />7/15/15
<br />7/15/15
<br />7/15/15
<br />7/15/15
<br />7/15/15
<br />Y
<br />MH
<br />131465752 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465753 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465754 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465755 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465756 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465757 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465758 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465759 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465760 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465761 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465762 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465763 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465764 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465765 CFD611202 150 15 2,250
<br />Y
<br />MH
<br />131465766
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/13/15
<br />Y
<br />JA
<br />131465767
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/13/15
<br />Y
<br />JA
<br />131465768
<br />CFD611202
<br />150
<br />15
<br />2,250
<br />7/13/15
<br />Y
<br />JA
<br />131465769
<br />CFD61120
<br />1150
<br />15
<br />2,250
<br />7/15/15
<br />Y
<br />I MH
<br />P:\14 Projects\14-101 ( SICDPW North County and Foothill)\Foothill CQA\Geosynthetics\Field Files\GEOCOMPOSITE DEPLOYMENT.xlsx
<br />
|