Laserfiche WebLink
• Wage 1 of 1 <br /> TABLE 6 <br /> SUMMARY OF LABORATORY TEST RESULTS—OPERATIONS LAYER SOIL <br /> CQA SERVICES FOR THE CONSTRUCTION OF AREA 2A AT <br /> FOOTHILL SANITARY LANDFILL, SAN JOAQUIN COUNTY, CA <br /> Project No.: 14-101-01 Contractor: R.J. Gordon <br /> Client: San Joaquin County <br /> Test USCS Percent Passing <br /> No. Date Classirication 1-inch "/4-i]ICII -3/s-i I I C I 1 #4 #200 Remarks <br /> Specification - * - 100* - - <br /> OPS-R1 08 28/15 SM 100 100 93 84 14 Pass <br /> OPS-R2 08/28/15 SM 100 100 87 82 17 Pass <br /> OPS-R3 08/28/15 SM 100 100 85 78 16 Pass <br /> OPS-R4 08/28/15 SM 100 98 91 83 13 Pass <br /> OPS-R5 08/28/15 SM 100 100 93 85 19 Pass <br /> OPS-R6 08/28/15 SM 100 100 88 83 14 Pass <br /> Measured Range 100 98 to 100 85 to 93 78 to 85 13 to 19 <br /> Measured Average 100 1 100 1 90 83 16 <br /> Note: <br /> *The maximum particle size for the operations layer was specified at 3/8-inch where in contact with the <br /> geomembrane and in the top foot above the geomembrane, and at 3 inches for the upper 1 foot. <br /> The maximum particle size was later relaxed to 1-inch by the Engineer based on field observations. <br /> Advsncnrl <br /> Earth P:\14 Projects\14-101(SJCDPW North County and Foothill)\Foothill CQA\Repo rt\Tables\Summary of Lab tests Ops layer.xlsx,OPS " <br /> GsofbdMKW elld E»uironrrwn(M CansulfaMy <br />