Laserfiche WebLink
2 of 10 <br />GCL DEPLOYMENT LOG <br />Project #: 14-101-01 <br />Project: Foothill Sanitary Landfill General Contractor: R.J. Gordon <br />Location: San Joaquin County Geosynthetics Subcontractor: Great Basin <br />Panel <br />Number <br />Roll <br />Number <br />Approx. <br />Location <br />Deployment <br />Date <br />Approx. <br />Deployed <br />Length <br />(ft) <br />Approx. <br />Deployed <br />Width <br />(ft) <br />Approx. <br />Deployed <br />Area <br />(ft2) <br />Approx. <br />Cumulative <br />Deployed <br />Area <br />W) <br />QA ID Remarks <br />51 <br />2264 <br />N Sloe <br />07/15/15 <br />97 <br />14 <br />1,358 <br />62 874 <br />JA <br />52 <br />2754 <br />N Slo e <br />07Z15/15 <br />97 <br />14 <br />1,358 <br />64,232 <br />JA <br />53 <br />2280 <br />N Sloe <br />07Z15/15 <br />97 <br />14 <br />1,358 <br />65,590 <br />JA <br />54 <br />2277 <br />N Sloe <br />07 <br />15 <br />15 <br />97 <br />14 <br />1358 <br />66 948 <br />JA <br />55 <br />2267 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />68,292 <br />JA <br />56 <br />2279 <br />N Sloe <br />07 <br />16 <br />15 <br />96 <br />14 <br />1,344 <br />69,636 <br />A <br />57 <br />2729 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />70,980 <br />JA <br />58 <br />2273 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />72,324 <br />JA <br />59 <br />2421 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />73,668 <br />JA <br />60 <br />2734 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />75,012 <br />JA <br />61 <br />1 2713 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />76,356 <br />JA <br />62 <br />2714 <br />N Sloe <br />07 <br />16 <br />15 <br />96 <br />14 <br />1,344 <br />77,700 <br />A <br />63 <br />2735 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />79,044VA <br />64 <br />2732 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />80 388 <br />65 <br />2718 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />81732 <br />66 <br />2748 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />83 076 <br />67 <br />2731 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />84 42068 <br />2719 <br />N Sloe <br />07 <br />16 <br />15 <br />96 <br />14 <br />1344 <br />85 76469 <br />2749 <br />N Sloe <br />07 <br />16 <br />15 <br />96 <br />14 <br />1,344 <br />87108 <br />70 <br />2733 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />88,452 <br />JA <br />71 <br />2746 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />89,796 <br />JA <br />72 <br />2723 <br />N Slo e <br />07/16/15 <br />96 <br />14 <br />1,344 <br />91,140 <br />JA <br />73 <br />2724 <br />N Sloe <br />07Z16/15 <br />96 <br />14 <br />1,344 <br />92,484 <br />JA <br />74 <br />2422 <br />N Sloe <br />07Z16/15 <br />96 <br />14 <br />1,344 <br />93,828 <br />JA <br />75 <br />2722 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />95,172 <br />JA <br />76 <br />2653 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />96,516 <br />JA <br />77 <br />2654 <br />N Sloe <br />07/16/15 <br />96 <br />14 <br />1,344 <br />97,860 <br />JA <br />78 <br />2247 <br />N Sloe <br />07/17Z15 <br />96 <br />14 <br />1,344 <br />99,204 <br />JA <br />79 <br />2721 <br />N Sloe <br />07 <br />17 <br />15 <br />96 <br />14 <br />1,344 <br />100,548 <br />JA <br />80 <br />2747 <br />N Sloe <br />07/17/15 <br />97 <br />14 <br />1358 <br />101,906 <br />JA <br />81 <br />2725 <br />N Sloe <br />07117/15 <br />97 <br />14 <br />1,358 <br />103,264 <br />A <br />82 <br />2710 <br />N Sloe <br />07Z17/15 <br />97 <br />14 <br />1,358 <br />104,622 <br />JA <br />83 <br />2711 <br />N Sloe <br />07/17/15 <br />97 <br />14 <br />1,358 <br />105 980 <br />JA <br />84 <br />2695 <br />N Sloe <br />07/17Z15 <br />97 <br />14 <br />1358 <br />107,338 <br />JA <br />85 <br />2686 <br />N Sloe <br />07/17/15 <br />95 <br />14 <br />1,330 <br />108,668 <br />JA <br />86 <br />2717 <br />N Sloe <br />07/17/15 <br />95 <br />14 <br />1330 <br />109,998 <br />JA <br />87 <br />2745 <br />N Sloe <br />07Z17/15 <br />95 <br />14 <br />1330 <br />111328 <br />A <br />88 <br />2744 <br />N Sloe <br />07Z17/15 <br />90 <br />14 <br />1,260 <br />1121588A <br />89 <br />2716 <br />N Sloe <br />07/17/15 <br />90 <br />14 <br />1,260 <br />113,848 <br />A <br />90 <br />2688 <br />N Sloe <br />07 <br />17 <br />15 <br />90 <br />7 <br />630 <br />114 478 <br />A <br />91 <br />2712 <br />Floor <br />07/20/15 <br />148 <br />14.5 <br />2,146 <br />116,624 <br />A <br />92 <br />2743 <br />Floor <br />07/20/15 <br />148 <br />14.5 <br />2,146 <br />118,770 <br />A <br />93 <br />2740 <br />Floor <br />07/20/15 <br />148 <br />14.5 <br />2,146 <br />120,916 <br />A <br />94 <br />2416 <br />Floor <br />07/20Z15 <br />148 <br />14.5 <br />2,146 <br />123,062 <br />A <br />95 <br />2417 <br />Floor <br />07/20Z15 <br />148 <br />14.5 <br />2,146 <br />125,208 <br />A <br />96 <br />2728 <br />Floor <br />07 <br />20 <br />15 <br />148 <br />14.5 <br />2,146 <br />127,354 <br />A <br />97 <br />2720 <br />Floor <br />07/20/15 <br />148 <br />14.5 <br />2,146 <br />129 500 <br />JA <br />98 <br />2738 <br />Floor <br />07/20/15 <br />148 <br />14.5 <br />2,146 <br />131,646 <br />JA <br />99 <br />2737 <br />Floor <br />07Z20/15 <br />148 <br />14.5 1 <br />133 792 <br />A <br />100 <br />2750 1 <br />Floor <br />1 07/20/15 <br />142 <br />14.5 <br />__2,146 <br />2,059 <br />135,851 <br />JA <br />101 <br />2415 <br />Floor 1 <br />07 <br />20 <br />15 <br />113 <br />14.5 <br />1639 <br />137 490 <br />A <br />P:\14 Projects\14-101 ( S]CDPW North County and Foothill)\Foothill CQA\Report\APP Deployment\GCL DEPLOYMENTAsx <br />C <br />C7 <br />