Laserfiche WebLink
4 of 4 <br />60 MIL DST HDPE DEPLOYMENT LOG <br />Project #:14-101-01 <br />Project: Foothill Sanitary Landfill General Contractor: R J Gordon <br />Location: San Joaquin County Geosynthetics Subcontractor: Great Basin <br />Panel <br />Number <br />Roll <br />Number <br />Site <br />Location <br />Deploym <br />ent Date <br />Approx. <br />Deployed <br />Length <br />( ft) <br />A <br />Approx. <br />Deployed <br />Width (ft) <br />Approx. <br />Deployed <br />Area <br />M) <br />Approx. <br />Cumulative <br />Deployed <br />Area <br />ft2 <br />QA I.D. Remarks <br />P-145 <br />1827 <br />Floor <br />7/31Z15 <br />123 <br />22 <br />2,706 <br />639,489 <br />JA MH <br />P-146 <br />1827 <br />Floor <br />7/31/15 <br />90 <br />22 <br />1,980 <br />641,469 <br />JA MH <br />P-147 <br />1765 <br />Floor <br />7Z31/15 <br />80 <br />22 <br />1,760 <br />643,229 <br />JA MH <br />P-148 <br />1825 <br />Floor <br />7/31/15 <br />65 <br />22 <br />1,430 <br />644,659 <br />JA MH <br />P-149 <br />1767 <br />Floor <br />7/31/15. <br />29 <br />22 <br />638 <br />645,297 <br />JA MH <br />P-150 <br />1770 <br />Floor <br />7/31/151 <br />120 <br />22 <br />2,640 <br />647,937 <br />JA MH <br />P-151 <br />1784 <br />Floor <br />7Z31/15 <br />86 <br />22 <br />1,892 <br />649,829 <br />JA MH <br />P-152 <br />1770 <br />Floor <br />7/31/15 <br />15 <br />22 <br />330 <br />650,159 <br />JA MH <br />P-153 <br />1770 <br />Floor <br />7/31/1 <br />20 <br />22 <br />440 <br />650,599 <br />P-154 <br />1770 <br />Floor <br />7/31/15 <br />20 <br />22 <br />440 <br />651,039 <br />S-1 <br />1770 <br />Sum <br />8/3/15 <br />70 <br />22 <br />1,540 <br />652,579 <br />rRNMH <br />S-2 <br />1770 <br />Sum <br />8 3 15 <br />70 <br />22 <br />1,540 <br />654,119 <br />S-3 <br />1770 <br />Sump <br />8 3 15 <br />70 <br />22 <br />1,540 <br />655,659 <br />RN MH <br />S-4 <br />1770 <br />Sum <br />8/4/15 <br />70 <br />5 <br />350 <br />656,009 <br />RN MH <br />S-5 <br />1827 <br />Sump Riser <br />8/4/15 <br />91 <br />22 <br />2,002 <br />658,011 <br />RN MH <br />L-1 <br />1782 <br />L simeter <br />-7117115 <br />10 <br />8 <br />80 <br />658,091 <br />MH <br />L-2 <br />1782 <br />L simeter <br />7117/15 <br />10 <br />8 <br />80 <br />658,171 <br />MH <br />L-3 <br />1782 <br />L simeter <br />7/17/15 <br />16 <br />5 <br />80 <br />658,251 <br />MH <br />L-4 <br />1782 <br />L simeter <br />17/17/15 <br />35 <br />9 <br />315 <br />658,566 <br />MH <br />P:\14 Projects\14-101 ( S)CDPW North County and Foothiliffoothill CQA\Report\APP Deployment\HDPE DEPLOYMENTAsx <br />C: <br />C7 <br />