Laserfiche WebLink
Complete I-Care X <br /> Cards <br /> 1 <br /> Observation/10 <br /> hours worked <br /> Complete CSE, X <br /> hot work,drilling, <br /> -xcavation,lifting, As <br /> or other work required <br /> permits <br /> Inspect tools and X <br /> equipment before <br /> use As <br /> required <br /> Vehicle/Heavy X <br /> Equipment <br /> Inspection <br /> Calibrate air X As <br /> monitoring needed <br /> equipment <br /> Download air X By electronics <br /> monitoring results group when <br /> machine comes in <br /> for inspection <br /> Fire ext. X <br /> Inspection <br /> First aid X <br /> Inspection <br /> Eye Wash/Safety X <br /> Shower Inspection <br /> ?roject HSE X X X X Bi-monthly <br /> nspection <br /> HSE Assessment X <br /> Quarterly <br /> Update/revise X <br /> HASP <br /> 6 month <br /> intervals <br /> 40 hr Contact Resource Manager to obtain training and medical records prior to the start of work onsite. <br /> HAZWOPER <br /> training <br /> 1-15 <br />