My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The sides and top of the 48 inch vertical riser extending above the ash waste <br />were strengthened with a minimum of 12 inches of steel reinforced concrete. <br />An opening was cut on the southern side of the vertical riser to accommodate a <br />36 inch diameter concrete riser, positioned horizontally, to allow access from <br />outside the waste management unit to the vertical riser and bottom collection <br />sump. A foundation built from compacted ash was constructed between the <br />vertical riser and the southern berm to support the 36 inch extension riser. <br />The riser was placed on the ash foundation and sloped at about 1.5% to the <br />south to allow drainage of condensate. A steel locking door was attached to <br />the outside end of the extension riser to prevent unauthorized access to the <br />leachate collection sump. <br />Future construction on the Forward Ash Pit will involve building a sidewall <br />liner along the existing western wall and extending the bottom clay liner and <br />bottom leachate collection system. Vertical expansion will continue as needed <br />along the southem and eastern berms of the ash pit, although no additional <br />expansion is scheduled at this time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.