My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />C <br />GeoSyntec Consultants <br />This Construction Quality Assurance (CQA) Plan describes the required field and <br />laboratory testing procedures for monitoring the construction of the final cover over the <br />Waste Management Unit (WMU) B disposal area at the Forward Landfill. The CQA <br />Plan was prepared by a registered civil engineer in accordance with Title 27, California <br />Code of Regulations (CCR), Division 2, §§20323 and 20324, titled "CQA Plan" and <br />"CQA Requirements". The goal of the CQA Plan is to ensure that the final cover is <br />constructed in accordance with the Project Plans, Technical Specifications, and Title 27 <br />requirements, under the supervision of a registered civil engineer or certified <br />engineering geologist. <br />The CQA Plan includes the following: <br />• Introduction <br />• Project Description <br />• Qualifications and Responsibilities <br />• Project Meetings <br />• Inspection Activities <br />• Sampling and Testing Program <br />• Documentation <br />At completion of the work, a final CQA report, including as -built drawings, will be <br />prepared by the CQA Team to document that the final cover materials and construction <br />procedures comply with the WMU B design documents and regulatory requirements. <br />I:XALLIED\FORWARD\CLOSUREIREPORT\CQAREPORT 1-1 99.11.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.