Laserfiche WebLink
contacted are moved to appropriate WMUs for disposal.- The clay pad is rebuilt <br /> to its original thickness after each drying cycle. <br /> Forward may decide to use sludge as an alternative:daily cover (ADC) as <br /> allowed by 27 CCR, Section 20690(b)(4): The, LEA wilt be notified prior to the <br /> use of sludge as an ADC. <br /> Current sludge operations consist only of direct disposal-in the.landfill or drying the <br /> sludge before disposing of it in permitted units. To allow recovery and secondary <br /> use of sludge as alternative cover=or,other,soil amendments, the sludge must be <br /> processed and treated using various available meth .ta. Get,the:.,applicabJe <br /> regulatory standards. <br /> Future sludge treatment may include processes that.will be mandated by the final <br /> application. Methods using centrifuges are a possibility. Other processing <br /> treatments will be evaluated as they are develop.ed. .Tb.e.pro.posed.,processes,wilI <br /> be discussed with the appropriate regulatory agencies before their use. <br /> 6.4.7.3 ASBESTOS DISPOSAL METHODS <br /> The existing Forward Landfill handles and disposes ACM,in..accordance with all <br /> applicable federal and state regulations. The health and safety of Forward <br /> employees and all persons involved in the disposal of asbestos at'the landfifi is <br /> provided through responsible site operations and employee medical surveillance. <br /> The air, groundwater, and soil monitoring systems at the Forward Landfill have <br /> been designed, operated, and mains ' ed for optimal environmental protection. <br /> Forward regularly evaluates its asb stos-handlitig.procedures and .as needed, <br /> upgrades the site operations and standards to exceed those required by local, <br /> state, and federal regulations. <br /> The delivery of all ACM to the Forward Landfill must be scheduled at least <br /> 24 hours in advance. Upon arrival at the landfill, the haulers must provide the <br /> proper documentation, including a completed Uniform Hazardous Waste Manifest <br /> and required notification and certification forms. All documents are checked by <br /> the scalehouse attendant for accuracy and completeness, and only then are the <br /> haulers allowed to proceed to the dumping area. Absolutely no ACM is accepted <br /> unless the above protocol has been satisfied. <br /> Forward Landfill JTD 6-12 <br /> L:\AI I ied\2000.193\Reports\fi naljtd:Sec-6.0:08/20/01 <br /> BRYAN A.STIRRAT 6 ASSOCIATES <br />