|
82. Moju Environmental Technologies, Contaminated Soil Acceptance Program, Forward,
<br /> Inc. Landfill, 1990.
<br /> 83. Moju Environmental Technologies, Alternative Daily Cover at Forward Landfill, San
<br /> Joaquin County, Evaluations and Findings, 1990.
<br /> 84. SCS Engineers, New Source Performance Standards, Tier II Sampling, Analysis, and
<br /> Landfill NMOC Emission Estimates, Forward Landfill, January 1999.
<br /> 85. Vector Engineering, Final Construction Quality Assurance Report for WMU D-98 and
<br /> the WMU D-94 Extension at the Forward, Inc. Landfill, January 1999.
<br /> 86. Vector Engineering, Final Construction Quality Assurance Report for WMU D-99
<br /> Class 11 Leachate Impoundment,,and Closure of the Eastern Ash Pit at the Forward,
<br /> Inc. Landfill, September 1999.
<br /> 87. Woodward-Clyde Consultants, Oakland-Federal Building Project, Proposed:
<br /> Bioremediation of Soil at the Forward Landfill, 1990.
<br /> Existing Austin Road Landfill Reports
<br /> 88. Camp Dresser & McKee, Austin Road Landfill Draft Weather Operations Plan,
<br /> September 1998.
<br /> 89. Camp Dresser & McKee, Austin Road Landfill Contaminant Plume Characterization
<br /> Report, January 1999.
<br /> 90. Camp Dresser & McKee, Storm Water Pollution Prevention Plan, Austin RoadLandfil.l,
<br /> February 1999.
<br /> 91. Camp Dresser & McKee, Groundwater Corrective Action Feasibility Study Report,
<br /> Austin Road Landfill, April 1999.
<br /> 92. CH2M HILL, First Quarter Monitoring Report, Austin Road Landfill, April 1998.
<br /> 93. CH2M HILL, Third Quarter Air Monitoring:Report, Austin Road Landfill Groundwater
<br /> Treatment Facility, October 1998_
<br /> 94. CH2M HILL, Third Quarter Monitoring Report, Austin Road Landfill Groundwater
<br /> Treatment Facility, October 1998.
<br /> 95. CH2M HILL, Third Quarter Soil Gas Monitoring Report, Austin Road and French
<br /> Camp Landfill, October 1998.
<br /> 96. CH2M HILL, Third Quarter Monitoring Report, Austin Road Landfill, October 1998.
<br /> 97. CH2M HILL, Fourth Quarter Air Monitoring Report, Austin Road Landfill Groundwater
<br /> Treatment Facility, January 1999.
<br /> 98. CH2M HILL, Fourth Quarter Monitoring Report, Austin Road Landfill Groundwater
<br /> Treatment Facility, January 1999.
<br /> Forward Landfill JTD 9-5
<br /> L:\Allied\2000.193\Reports\tdfinal:Sec-9.0:08/20/01 BRYAN A.STIRRAT A ASSOCIATES
<br />
|