Laserfiche WebLink
TABLE 2 <br /> FORWARD LANDFILL <br /> CIWMB JTD INDEX <br /> CIWMB Section SWRCB Section JTD Page(s) <br /> � ) <br /> CIWMB JTD Requirements No. No. <br /> General <br /> Name of Facility, Site Operator and Owner 21600(b)(1)(A) 1.1 - P. 1-1 <br /> Description of the Operation Cycle 21600(b)(1)(A) 6.0- pp.6-1 thru <br /> 6-18 <br /> Site Plan Including Boundaries,Acreage,and Buffer Zones 21600(b)(1)(B) Drawings 2,3,4, <br /> 5 and Figur 3 <br /> Hours of Operation 21600(b)(1)(C) 6.1 - p. 6-1 <br /> Waste Classification and Management <br /> Types and Quantities of Waste 21600(b)(2)(A) 21740(a)(1) 4.2, 4.3, 4.4- pp. <br /> 1"Ahru,4-9 <br /> Waste Management Unit Classification and Siting <br /> Airport Safety 21600(b)(3)(A) 2.4 - p. 2-3 <br /> Volumetric Capacity 21Wq(b)(3•0) 4r5<,_-pp.4-9,4hru. <br /> 4-10 <br /> Site Life Estimate 21600(b)(3)(C) 4.6 - pp.4-10 <br /> thru 4-11 <br /> Site Location (vicinity map) 21600(b)(3)(D) 2.2 - pp.2-1 thru <br /> 2-2 <br /> Surrounding Land Use and Zoning(plot plan) 21600(b)(3)(E) 21750(h)4 2.3 - pp.2-2 thru <br /> Ancillary Facilities(include on plot plan) 21600(b)(3)(F) 2.2 - pp.2-1 thru <br /> 2-2, Drawing 2 <br /> Design and Construction Standards for All Waste Mana ement Units <br /> Design Responsibility 21600(b)(4)(A) 21750(a-h) .3.0 -„pp..3-1 <br /> thru 3-17, 5.2 - <br /> pp. 5-1 thru 5-13 <br /> [Describe how the site design provides for the <br /> surrounding physical setting] <br /> Design Responsibility 21600(b)(4)(B) 5.2 - pp 5-1 <br /> thru 5-13 <br /> [New disposal sites shall be designed under a civil engineer] <br /> Construction Sequencing Plans 21600(b)(4)(C) 5.2.5 - pp. 5-8 <br /> thru 5-9 <br /> Grading Plan 21600(b)(4)(D) 21090(b)-(b)(3) 5.2.3 - pp. 5-4 <br /> thru 5-5 <br /> [Include existing and proposed final contours <br /> for disposal area and borrow area] <br /> Gas Management Plan 21600(b)(4)(E) 5.2.7 - pp. 5-11 <br /> thru 5-13, 5.3.7 <br /> - pp. 5-25 thru <br /> 5-26, 7.5 - pp. 7- <br /> AMOL thru 7-13 <br /> (Demonstrate the ability to comply with T2720919,20919.5 and <br /> gas control for closure plans/ <br /> Forward Landfill JTD 1 of 5 <br /> (L:\Allied\2000.193\Reports\finaljtd:CIWMBIDX:8/22/01) <br /> BRYAN A.STIRRAT 6 ASSOCIATES <br />