Laserfiche WebLink
TABLE 2 <br /> FORWARD LANDFILL <br /> ESTIMATED GROUNDWATER MITIGATION COSTS <br /> Element Units Unit Rate Subto <br /> LFG Collection Wells 10 wells at 100 ft;. 495/ft. <br /> Add. LFG Conveyance 1 Q 1000 $20 ft. $204000 <br /> GW Extraction Wells 2 Q 1.20 feet _ ,$85 ft $20`400.. <br /> Pumps 2 $3500 ea. $7000 <br /> Conveyance System 1 @.1.000 . I I 435 ft. $3,5;" <br /> Basin Construction 3 Acres Q 5 ft. $5 c $121,000 <br /> Engineering LS $441760 <br /> Contingencies LS 10% $344316 <br /> TOTAL $377,476 <br /> Forward Landfill JTD <br /> L:\Allied\2000.193\Reports\finaljtd:Est CAP Costs:8/20/01 <br /> BRYAN A.STIRRAT S ASSOCIATES <br />