My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:48:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 300 � ---------- ---_-- -�- i------�---- �-------f------- ---- - -- - ---- --- ------ ----- ----- � <br /> I I m <br /> I j <br /> BROPOSED CLASS II <br /> ASTE PLACEMENT <br /> 1 <br /> .17RM TATE <br /> g LINER 1 INTERIM FINAL <br /> 3 I RMEDIATE 3 COVER <br /> 11001 <br /> PROPOSED CLASS II WASTE III WASTE <br /> OPERATIONS AREA <br /> NG III M.. JN o <br /> __ _ > <br /> ____-- ONOm <br /> 2 SLOPE LINER 1 BASE LINER <br /> B g <br /> SECTION A A <br /> SCALE 1•-60' $ <br /> a <br /> U <br /> d <br /> 0 <br /> N <br /> O <br /> i <br /> ", O INTERMEDIATE LINER TO BE PLACED AT SOUTH <br /> SLOPE FACE OF EXISTING AUSTIN ROAD LANDFIU: w v <br /> SOUTHERLY PHASE BASE LINER AND SLOPE LINER <br /> TO BE INSTALLED. a a N <br /> 2O INTERIM FINAL COVER PLACEMENT TO OCCUR O INTERMEDIATE <br /> M�TE 3 0 0, <br /> AFTER PLACEMENT OF CLASS I6 WASTE TO 5% 6 <br /> SUBGRADE FOR INTERIM FINAL COVER. w J J c <br /> -a 0 <br /> BALANCE OF INTERMEDIATE LINER TO BE PLACED a°�U a <br /> AFTER PLACEMENT OF CLASS 111 WASTE ABOVE <br /> INTERIM FINAL COVER(SOUM SLOPE FACE TO o rn <br /> BE AT 5:1 (H TO V)SLOPE RATIO). 30'TRANSITION - INTERIM FINAL COVER TO INTERMEDIATE LINER ED <br /> J N <br /> O4 PORTIONS OF PROTECTIVE SOIL LAYER AND C <br /> DRAINAGE GRAVEL TO BE REMOVED TO ALLOW 15' 15' IL <br /> 24'LOW PERMEABILITY LAYER TO BE PLACED <br /> FOR BALANCE OF INTERMEDIATE LINER. ®MATERIAL REMOVAL TO <br /> ALLOW LOW PERM PLACEMENT71 �'.;' <br /> O INTERMEDIATE 3 <br /> � LINER 6 1� - :. : 5% ' <br /> - DRAINAGE GRAVEL OR GEOCOMPOS E N <br /> - a PROTECTIVE SOIL LAYER v d <br /> 1x10° mise OR GCL A/ <br /> g <br /> LOW PERMFABIUTY SOIL ( ) /�-�\ ;.\ \. ��, 24" FOUNDATION r <br /> SOIL LAYER O U <br /> e) OR GCL V <br /> b. I <br /> EBLIY SOIL (1x0 _/ I ' -1=11(EXSTING INTERIM CLOW PERM \ + I <br /> FOUNDATION LAYER <br /> ZZ <br /> EXISTING INTERIM COVER — O2 INTERIM 1 :20 <br /> - — <br /> sal COVER 3 o WIz - <br /> I a 00 cn <br /> a <br /> .< vNi <br /> a o <br /> D <br /> U� <br /> � Z <br /> U <br /> O 0 <br /> 30' GEOMEMBRANE AND GEOCOMPOSRE PLACEMENT z a <br /> WITH INIMI.INTERMEDIATE LINER PLACEMEN 0 <br /> INTERIM FINAL COVER TO INTERMEDIATE LINER TRANSITION 1 <br /> HIS 8 <br /> SheetALofS_ <br /> Rey <br /> 1 cww awa 4�a.e.s <br />
The URL can be used to link to this page
Your browser does not support the video tag.