My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:48:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be <br /> As the new cells are filled, additional vertical extraction wells will be extended as <br /> ed in <br /> phases to control surface landfill gas emi Thesewells <br /> relplaced with new wells <br /> the fill progresses in the cell, or may be abandoned <br /> when the fill reaches the final grade elevation. <br /> As the fill progresses above the existing and now-lined refuse prisms, additional <br /> vertical extraction wells will be placed into the upper portions of the landfill to <br /> achieve the proper spacing required for surface emissions control. <br /> Permits will be obtained from the San Joaquin Valley Air Pollution Control' <br /> District (SJVAPCD) and other appropr <br /> iate 'ageTmjes=(ovahe construction.and <br /> operation of each phase of gas system development. <br /> 5.3 DESIGN CALCULATIONS <br /> 5.3.1 SOIL BALANCE <br /> Soil excavated from each phase (Table 9) will be stockpiled in areas of°future <br /> phases or on the-former-borrow-area lnQrh of the existing Austin s in ° 4i11 <br /> This stockpiled soil (estimated total excavation quantities areapproximately <br /> mcy), can be utilized for daily cover operationsf,if"eeded, or will be saved for <br /> final cover soil,n.eeds.(,a roximatel 564,974 cy). The existing Forward Landfill <br /> ,Pp y <br /> currently accepts construction debris and conta t"soil in 0 presents�phase fill and <br /> cient <br /> quantities to pr�ovid�e#or,-daily cover operations. Table <br /> soil volumes required for each phase as well as soil available onsite arid"imp0'rt <br /> or borrow required. Any soil surplus or`deficitwill be stockpiled/borrowed from <br /> the existing borrow area located northofthe existing Austin Road Landfill. See <br /> Appendix C for landfill capacity/soil calculations. <br /> 5.3.2 STATIC AND SEISMIC STABILITY <br /> The stability of the proposed expanded Forward Landfill facility ared evaluated <br /> BAS and <br /> available <br /> y <br /> Geologic Associates (GLA) based on development <br /> a pd linerlans materials. As <br /> available information regarding likely <br /> required in 27 CCR, the analyses addressed both the surficial stability oe annal <br /> alyses <br /> cover soils and the gross stability of!o dpnanned conditions, and expansion. The <br /> evaluation <br /> is considered static and pseudo static g <br /> of the seismic displacement that could occur under earthquake loads. <br /> 5-13 <br /> Forward Landfill JTD <br /> L:\Allied\2000.193\Reports\finaljtd:Sec-5.0:08/22/01 nSSc3C1 -T <br />
The URL can be used to link to this page
Your browser does not support the video tag.