My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:48:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LCRS Pipe Capacity <br /> Since the largest tributary area within the planned new liner system is <br /> approximately 23 acres, the peak daily flow through leachate collector pipes to <br /> the leachate sumps will be approximately 0.14 cfs. Recognizing that 27CCR <br /> regulations require that the LCRS pipes be designed to accommodate double the <br /> peak daily leachate generation rate, the LCRS pipe at the facility should be <br /> designed to accommodate approximately 0.28 cfs. The maximum capacity of a <br /> 6-inch diameter mainline LCRS pipe at a two percent slope is 1.03 cfs, therefore <br /> the factor of safety is 36.78, for the-proposed 6-inch diameter LCRS maiti#ines <br /> (see Appendix D for supporting calculations). <br /> 5.3.6 SURFACE WATER CONTROL <br /> The drainage system calculations are includedin Appendix G and a hydrniogy <br /> map is shown on Drawing 10. Storm water runoff volumes were calculated and <br /> final storm water drainage control facilities were sized using the Rational Method <br /> and the design criteria in 27 CCR, Section 203.2.0.-.The.Rational Method.used,to <br /> calculate the runoff peaks and to size the control facilities is as follows: <br /> q = CiA <br /> Where q = Peak runoff rate, cfs <br /> C = Runoff coefficient <br /> i = Rainfall intensity for the design return period (1,000-year return) and <br /> for a duration equal to the-time of-concentration of the watershed, <br /> in/hr <br /> A= Watershed area, acres <br /> The runoff coefficient and rainfall data used were based on criteria in the County <br /> of San Joaquin Hydrology Manual. The runoff coefficient incorporates the effects <br /> of several factors in its computation; soil infiltration, vegetative cover, relief of <br /> slopes and surface storage. The rainfall intensity is based on a duration equal to <br /> the time of concentration. The time of concentration is defined as the time <br /> required for water to flow from the hydraulically most distant point in the <br /> watershed to the point of design. <br /> The drainage plan for the final grading plan is shown in Drawing 9. The drainage <br /> network for the completed landfill is designed to intercept and convey flows from <br /> Forward landfill JTD 5-24 <br /> t_:\Allied\2000.193\Reports\finalj td:Sec-5.0:08/22/01 <br /> BRYAN A.STIRRAT S.ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.