My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
853
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
if <br />-9- <br />WASTE DISCHARGE REQUIREMENTS <br />FOR CITY OF STOCKTON <br />AUSTIN ROAD LANDFILL- FACILITY <br />CLASS III LANDFILL <br />SAN JOAQUIN COUNTY <br />9. Each landfill unit phase constructed after the effective date of this Order shall be <br />designed and constructed in accordance with Chapter 15 and this Order and approved <br />by Board staff prior to operation. Prior to the beginning of construction for each new <br />construction phase, a Final Design Report shall be submitted to Board Staff for <br />review and approval and shall include, but not be limited to, the engineered design <br />ifications, a construction quality, assurance <br />plans for the WIviU, the contract spec <br />(CQA) plan to verify that construction specifications will be met, and a revised water <br />quality monitoring plan. Approval of the final design report shall be obtained from <br />Board staff prior to construction of the landfill liner or -cap. A.final.construction <br />report.shall be submitted for approval by Board staff after each phase of construction <br />and prior to the discharge of waste into the constructed please. 'The -final construction <br />report shall include, but not be limited to, as -built plans for the WMU, a CQA report <br />with a written summary of the CQA program and allatestremits, erialyses, and.:oopies <br />othe inspector's original field notes, and a certification as described in the Standard <br />Provisions and Reporting Requirements. <br />Protection From Storm Events <br />10. Precipitation and drainage control systems shall be designed, constructed and <br />maintained to accommodate the anticipated volume of precipitation and peak flows <br />from surface runoff under 100 -year, 24-hour precipitation conditions. <br />11. Waste management units shall be designed; -constructed and operated in compliance <br />with precipitation and flood conditions contained in the Standard Provisions and <br />Reporting Requirements referenced in Provision D.1, below. <br />12. Annually, prior to the anticipated rainy- season, ;Wnecessary "eroSion control <br />measures shali-be implemented, and'any necessatq`construction, maintenance, or <br />repairs of precipitation and drainage control facilities shall be completedtoprevent <br />erosion dr=floodi - of the site andto pre Wit: ace d�aina$e from contacting or <br />percolating through wastes. <br />Landfill Specifications <br />14. Municipal solid waste shall be discharged to either (a) that portion of a module which <br />received wastes (i.e., that active portion of the module which is within the boundaries <br />of the Existing Footprint), or (b) to an area equipped with a containment system <br />which meets the additional requirements for both liners and leachate collection <br />systems specified below. - <br />
The URL can be used to link to this page
Your browser does not support the video tag.