My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
853
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SanJoaquin Valley PID <br /> Air Pollution Control District <br /> PERMIT UNIT: N-339-9-1 EXPIRATION DATE: 07/31/2006 <br /> EQUIPMENT DESCRIPTION: <br /> ONE 500 GALLON ABOVE GROUND GASOLINE STORAGE TANK SERVED BY A PHASE I VAPOR RECOVERY <br /> SYSTEM AND ONE NOZZLE. <br /> PERMIT UNIT REQUIREMENTS <br /> 1. Total gasoline throughput for the facility shall not exceed 10,000 gallons per any consecutive 30-day period nor 24,000 <br /> gallons per calendar year. [District Rule 4622,4.1, Exemptions]Federally Enforceable Through Title V Permit <br /> 2. Records of monthly gasoline throughput shall be maintained,retained on the premises for a period of at least five years <br /> and as long as exempt status is claimed. These records shall be made available for District inspection upon request and <br /> allow the gasoline throughput for any 30-day period to be continuously determined. [District Rule 2520,9.4,2 and <br /> 4622,6.1.1]Federally Enforceable Through Title V Permit <br /> 3. If the gasoline throughput exceeds either 10,000 gallons per any consecutive 30-day period or 24,000 gallons per <br /> calendar year,then the facility shall notify the District within 30 days. [District Rule 4622, 6.1.2] Federally <br /> Enforceable Through Title V Permit <br /> 4. Each storage tank subject to this permit shall be equipped with an ARB certified Phase I vapor recovery system,which <br /> shall prevent at least 95%by weight of all gasoline vapors displaced during the filling of storage tanks from entering <br /> the atmosphere.The transfer of gasoline from any delivery vessel to any stationary storage container with 250 gallon <br /> capacity or more shall not be allowed unless the container is equipped with a permanent submerged fill pipe and an <br /> ARB certified Phase 1 system,which is maintained and operated according to manufacturers specifications. [District <br /> Rule 4621,3.1 and 5.1.1]Federally Enforceable Through Title V Permit <br /> 5. Compliance with the requirement of the Phase I system to be 95%effective for displaced vapors is considered to be <br /> demonstrated by passing performance tests, at least once every 5 years from the date of the most recent test or at more <br /> frequent intervals,as specified by the ARB Executive Order certifying the system. Facilities that have not been <br /> performance tested previously,using'the following applicable methods,shall be tested in accordance with BAAQMD <br /> Source Test Procedure ST-38 (Static Leak Test Procedure Aboveground Tanks)no later than 90 days of issuance of <br /> this permit. [District Rules 2520,9.3.2]Federally Enforceable Through Title V Permit <br /> 6. Each aboveground storage tank shall be equipped with a pressure-vacuum valve set to within 10%of the maximum <br /> allowable working pressure of the tank. No gasoline shall be placed,stored,or held in any above-ground tank of 250 <br /> gallon capacity or more unless it is so equipped. [District Rule 4621,5.1.2;4623, 5.4]Federally Enforceable Through <br /> Title V Permit <br /> 7, No gasoline delivery vessel shall be operated or be allowed to operate unless valid State of California decals are <br /> displayed on the cargo.tank which attest to the vapor integrity of the tank. [District Rule 4621,5.2.1] Federally <br /> Enforceable Through Title V Permit <br /> 8. No gasoline shall be transferred into any gasoline stationary storage tank subject to this permit if the vapor recovery <br /> system contains an inoperative dry break until it is repaired,replaced,or adjusted as necessary to correct the defect. <br /> [District Rule 2520,9.3.2]Federally Enforceable Through Title V Permit <br /> 9. Compliance with permit conditions in the Title V permit shall be deemed compliance with the following requirements: <br /> SJVUAPCD Rules 4621 except section 5.2.2(as amended May 20, 1993),4622, section 6.1(as amended February 17, <br /> 1994),and 4623,section 5.4 (as amended December 17, 1992). A permit shield is granted from these requirements. <br /> [District Rule 2520, 13.2] Federally Enforceable Through Title V Permit <br /> PERMIT UNIT REQUIREMENTS CONTINUE ON NEXT PAGE <br /> These terms.and conditions are part of the Facility-wide Permit to Operate. <br /> Facility Name: FORWARD,INC.LANDFILL <br /> Location: 9999 S.AUSTIN ROAD,MANTECA,CA 95336 <br /> N•33PW l.Au,t s 2.4:34PM—90NOCOJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.