Laserfiche WebLink
Permit Unit Requirements for N-339-17-7 (continued) Page 6 of 6 <br /> 64. Permittee must conduct initial performance tests of the landfill gas collection system and air pollution control <br /> equipment on or before April 4,2003, or 30 months and 180 days after the first annual emission rate report showing <br /> NMOL emissions>50 megagrams/year,unless a site-specific schedule is approved by EPA. [40 CFR 62.14356(a)(5)] <br /> Federally Enforceable Through Title V Permit <br /> These terms and conditions are part of the Facility-wide Permit to Operate. <br /> Facility Name: FORWARD.INC.LANDFILL <br /> Location; 9999 S.AUSTIN ROAD,MANTECA,CA 95336 <br /> N-330-17.7.,Nal 142005 4:42PM-510NOCO) <br />