My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
853
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 DIFFERENTIAL SETTLEMENT EFFECTS ON THE VERTICAL EXPANSION <br />LINER SYSTEM <br />Vertical expansion for the Austin Road Landfill consists of constructing a landfill liner system <br />over the final cover of the existing landfill. The concerns for this type of landfill expansion is <br />potential damage to the integrity of the liner system and loss of drainage slope due to <br />differential settlement of the underlying refuse. These are similar to the problems with final <br />closure settlement. However, the primary settlement mechanism in the existing refuse fill <br />below the vertical expansion liner is anticipated to be mechanical compression from: the weight <br />of the vertical expansion refuse fill instead of decomposition of the existing refuse; This is <br />because the age of the existing refuse will be approximately 25 to 50 years at the time of vertical <br />expansion and is expected to have completed most of its biological decomposition phase. <br />4.1 COMPRESSIVE SETTLEMENT UNDER THE VERTICAL EXPANSION LINER <br />The method of analysis for this settlement type is to determine the settlement of the existing <br />refuse due to the additional weight (i.e., surcharge) of the vertical expansion,zefuse. and mal <br />cover system. The settlement calculation calculated both the primary (short term) <br />consolidation and the secondary (long term) consolidation (Calculation No. 5) based on the <br />following assumptions: <br />■ The primary consolidation coefficient (Cc) was assumed to be 0.5. Landva(6) <br />reported test values for Cc in the range of 0.2 to 0.5. with older refuse in the lower <br />range. The selection of the higher value should provide a conservative over estimate <br />of the landfill settlement. <br />■ In-place refuse/daily cover density was,assumed .to be 70 lbs/ft ^ 3 <br />■ The secondary consolidation coefficient (Cs) was assumed to be .02 based on values <br />reported for southern California Landfills('). Time period of settlementwas 30 years. <br />Settlement of the existing landfill refuse under the vertical expansion liner from compressive <br />settlement is expected to range from approximately 2 to 4 feet. However, the general grade of <br />the landfill slope will not appreciably change. This is because, generally, the depth of the <br />vertical expansion refuse overburden decreases as the depth of the existing landfill refuse <br />increases. The resulting effect is that while the percentage of settlement changes in the <br />existing landfill refuse, the elevation settlement in feet only shows a minor change. ,For <br />example the 5% minimum design grade after settlement varied from 4.9% to 5.6%. Overall <br />strain on the liner system is expected to be negligible. However, this analysis does not try to <br />account for possible settlement in the geologic subgrade under the existing landfill and/or <br />possible variation in the compressive settlement of the waste fill. Also, the parameters for the <br />analysis were based on literature values and may not accurately represent the characteristics <br />for the Austin Road Landfill refuse. It is recommended that additional geotechnical <br />isinvestigation work be conducted prior to the final design of the vertical expansion to define the <br />compaction characteristics and variability of the existing landfill refuse. It is also recommended <br />WW-1811-CAl-AA/3110 Austin Road Landfill Expansion August 2,1995 <br />ML1033.DOC Landfill Settlement Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.