My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
853
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in soil stockpiles -on the existing landfill <br />■ Consideration should be given to developingg <br />during the operation of the landfill horizontal expansion to provide for preloading <br />consolidation prior to the vertical expansion liner construction. Dynamic <br />compaction should be considered in local areas where the effects of settlement may <br />be more critical, such as along leachate collection trench alignments. <br />■ Additional geotechnical field work and settlement analysis should be conducted to <br />determine the settlement characteristics of the horizontal expansion subgrade prior <br />the final liner design. <br />7.0 CONCLUSION <br />Based on the analysis of this report, it is R. W. BecKs opinion that the Austin Road Landfill <br />horizontal and vertical expansions are technically feasible and that adequate design methods <br />and landfill technologies are available to assure the long-term environmental -pe rformance of <br />the landfill. A primary concern will be the performance of the vertical expansion liner. <br />However, the proposed method of developing the horizontal expansion areas, p r 40:the <br />vertical expansion areas is expected to mitigate potential problems from decomposition <br />settlement and will allow for an extended period of time to collect settlement data on the <br />ASUL existing landfill and possibly surcharge areas with soil stockpiles. Also, by the time of the final <br />design for the vertical expansion phases, a number of long-term case histories, ior.verlical <br />expansion landfills and liner systems will be available for review and it is expected that the <br />technology for vertical expansion liner systems will be firmly established. <br />As previously stated in the Introduction, -this -report should be considered.an..initial_evaluation <br />of these settlement issues and a demonstration of the technical feasibility of the project, but <br />does not constitute a final design analysis. for -the landfill expansion liner.. or cover system. <br />Additional design analysis and geotechnical studies will be required, prior to final design of the <br />horizontal and vertical expansion'diner"a°nd yfi°nal over°systems. References.,and._,calculations <br />are attached to this letter. <br />If you have any comments or questions related to this report, please contact me at your <br />convenience. <br />Very Truly Yours, <br />R. W. BECK <br />Mark Ingham <br />Project Engineer <br />Attachments <br />WW-1811-CA1-AA/3110 Austin Road Landfill Expansion August 2,1995 <br />MLI033.DOC Landfill Settlement Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.