Laserfiche WebLink
FROM (TUE)RUG 21 2007 9:21/ST. 9:17/NO. 6333050928 P 4 <br /> Conditions for N-339.17.11 (continued) page 3 of 4 <br /> 25. During maintenance of the gas collection system or incineration device,emissions of landfill gas shall he minimized <br /> during shutdown.[District NSR Rule]Federally Enforceable Through Title V Permit <br /> d <br /> 26, Maintenance is defined as work performed on a gas collection system and/or control device in order to ensure <br /> continued compliance with District rules,regulations,and/or Permits to Opmtc,and to prevent its failure or <br /> malfunction.(District NSR Rule)Federally Enforceable Through Title V Permit <br /> 27. The gas collection system shall be operated such that the concentration of total organic conzyaeands(as CH4)shall not <br /> exceed 1,000 ppmv at any point along the gas transfer path of the gas collection system.[District NSR Rule] Federally <br /> Enforceable Through Title V Permit <br /> 28. The entire gas collection system shall be inspected for leaks with a portable analyzer in accordance with EPA Method <br /> 21 at least quarterly.After four successful inspections,the frequency shall be annually.If a leak is detected,quarterly <br /> inspections shall resume.A teak is defined as a measurement in excess of 1,000 ppm(measured as methane)above <br /> background when measured at a distance of one(1)centimeter from the potential source,beaks shall he repaired <br /> within 15 calendar days after it is detected. [District NSR Rule]Federally Enforceable Through Title V Permit <br /> 29. The permittee shall notify the APCO by telephone at least 24 hours before performing any maintenance work that <br /> requires the system to be shutdown. The notification shall include a description of work,the date work will be <br /> performed and the amount of time needed to complete the maintenance work.[District NSR Rule]Fcdcrally <br /> Enforceable Through Title V Permit <br /> 30. Permittee shall maintain records of system inspections including:date,time and inspection results.[District Rule 1070] <br /> Federally Enforceable Through Title V P=it <br /> 31. Permittcc shall maintain records of maintenance related or other collection system and control device downtime, <br /> including individual well shutdown.[District Rule 10701 Federally Enforceable Through Title V Permit <br /> 32. The operator shall record emission control device source tests(emissions of CO,NOx,and VOC)in pounds per '. <br /> btu heat input.Opemtor shall also record VOC destruction/treatment efficiency. [District Rule 108 1]Federally <br /> Enforceable Through Title V Permit <br /> 33. Permittee shall maintain daily records of landfill gets flow rate to the flare.[District Rule 10701 Federally Enforceable <br /> Through Title V Permit >. <br /> 34, Permittee shall maintain annual records of landfill gas flow rate to the flare.[District NSR Rule]Federally Enforceable <br /> Through Title V Permit <br /> 35. All records shall be retained for a period of at least 5 years and shall be made available for District inspection upon s. <br /> request.[District Rule 1070]Federally Enforceable Through Title V Permit <br /> 36. Each owner or operator shall keep for at least 5 years up-to,-date;readily accessible,on-site records of the maAimum <br /> design capacity,the current amount of solid waste in-place,andthe year-by-year waste acceptance rate. Off-site <br /> records may be maintained if they are retrievable within 4 hours. [40 CFR 60.758(x)and District Rule 2520,9.3.2] <br /> Federally Enforceable Through Title V Permit <br /> 37. This operating permit may be cancelled with APCO approval when the landfill is closed,pursuant to the requirements <br /> of this permit,if the landfill is not otherwise subject to the requirements of either 40 CFR part 70 or part 71 and if <br /> either 1)it was never subject to the requirement for a control system under 40 CFR 60.752(bx2);or 2)the owner or <br /> operator meets the conditions for control system removal specified in 40 CFR 60.752(bx2)(v). [40 CFR 60.752(4)] <br /> Federally Enforceable Through Title V Permit <br /> 38. If the landfill is permanently closed,a closure notification shall be submitted to the APCO within 30 days of waste <br /> disposal cessation. A permanent closure must take place in accordance with 40 CFR 258.60. If a closure report has <br /> been submitted,no additional waste may be placed in the landfill without filing a notification of modification to the <br /> APCO,pursuant to 40 CFR 60.7(a)(4).[40 CFR 60.752(bxl)(ii)(B)and 60.757(d)]Federally Enforceable Through <br /> Title V Permit <br /> CONDITIONS CONTINUE ON NEXT PAGE <br /> N=49 17-11:AW 14 9W7 I*VM..ROM019 <br />