My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
853
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C� <br />hour, 1,000 -year storm event. A computer program developed by Advanced <br />Engineering Software was used to compute the run-off. The hydrology study <br />map indicating drainage sub -areas and discharge points and calculations for on <br />site and off-site flows is presented on Drawing 10 of the JTD. A summary of the <br />peak discharge rates are included in the hydrology study calculations included in <br />Appendix G of the JTD. <br />3.6.1.2 PROPOSED FINAL DRAINAGE CONTROL SYSTEM <br />The proposed final drainage control system for the Forward Landfill is shown on <br />Drawing 9 of the JTD. The final surface area of the landfill decks will be graded <br />at a minimum three percent gradient to prevent ponding and promote lateral <br />runoff. <br />The proposed final drainage control system will include exterior slope <br />downdrains, engineered deck area gradients anddrainage,b,erms,..deck.inlets, <br />bench drains and inlets, perimeter trapezoidal channels, and sedimentation <br />basins. Drainage details are presented in Drawing 7 of the JTD. Some of 2the <br />interim drainage control features may be utilized as part of the final drainage <br />control system for the site. <br />3.6.2 SOIL LOSS ANALYSIS <br />The Universal Soil Loss Equation (USLE) was used to evaluate potential soil losses <br />within the watershed boundary of the Forward Landfill site. The USLE was <br />initially intended for analysis of meadows and cropland soil loss. However, with <br />certain engineered assumptions, it can be applied to soil cover over landfills. <br />The USLE is: <br />A = <br />RKLSCP <br />where A = <br />average soil loss, in tons/acre <br />R = <br />rainfall and run-off erosivity index <br />K = <br />soil erodibility factor, tons/acre <br />L = <br />slope -length factor <br />S = <br />slope -steepness factor <br />C = <br />cover -management factor <br />P = <br />practice factor <br />Forward Landfill PCPCMP 3-9 <br />L:\Allied\2000.193\Reports\FinaIPCPCMP:FL-sec3: 8/20/01 BRYAN A. STIRRAT & ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.