Laserfiche WebLink
check that the locking mechanisms are intact and workable. Any necessary <br />repairs or replacements will be made during the quarterly inspection. <br />4.10 LANDFILL SETTLEMENT MONITORING AND MONUMENT MAINTENANCE <br />4.10.1 SURVEY RECORD <br />Regulatory requirements dictate that, upon completion of closure construction <br />activities, a survey record of the closed landfill be established and recorded with <br />the title of the property, with the County Recorders office and copies be made <br />available to the CIWMB, LEA and kept on-site at the administration offices. The <br />survey of record will include the following information: <br />• The date closure construction was completed; <br />• Boundaries of the disposal area; <br />• The location and telepthone number of where the closure and post -closure <br />plans can be obtained; and <br />• A statement that the future site use is restricted in accordance with the post - <br />closure maintenance plan. <br />- 4:10.2 SURVEY/SETTLEMENT MONUMENTS <br />In accordance with 27 CCR, Section 20950 (d), survey/settlement monuments <br />are to be established at the landfill so that facilities constructed during closure <br />can be located and controls can be provided from which to monitor future <br />_Landfill settlement. After completion of the final cover., settlement monuments <br />will be set on the landfill in the disposal area as shown on Drawing 4 of the JTD. <br />These monuments will be used to monitor settlement within the closed landfill <br />and will allow for a determination of the actual settlement that occurs over the <br />post -closure maintenance period. <br />Additionally, 27 CCR, Section 21090 (e)(2) requires operators to produce iso - <br />settlement maps every five years throughout the post -closure maintenance <br />period or until settlement has ceased. Prior to an aerial survey, the monuments <br />will be surveyed for horizontal and vertical control so that an accurate disposal <br />area topographic map can be developed. Aerial "targets" will be placed over <br />these monuments after the survey has been completed and an aerial <br />Forward Landfill PCPCMP 4-5 <br />L:\Allied\2000.193\Reports\FinaIPCPCMP:FL-sec4: 8/20/01 BRYAN A- STIRRAT & ASSOCIATES <br />