Laserfiche WebLink
Attachment 4 <br />Forward Landfill - 187.6 -Acre Closure Area <br />Gas Control System Modifications Cost Estimate <br />Item <br />No. Description <br />Qty 187'6- Unit <br />Acre Area <br />Unit Costs <br />Total <br />Cost <br />1 Construction Mobilization/Demobilization (1) <br />2 Salvage and re install well manifold <br />0 <br />EA $ <br />$C <br />3 Salvage and re-installwellhead assembly <br />38 <br />$ <br />2,248.25 <br />. <br />$84,354 <br />4 2" SCH 80 PVC welt lateral &fittings in trench/sleeve <br />29 <br />$ <br />189.18 <br />$5,521 <br />5 2" SDR 9 HDPE compressed air to common trench (jumper) <br />6,253 <br />7 22 <br />$26,487 <br />6 Salvage and re -install 2" HDPE compressed air/condensate <br />LF $ <br />2'81 <br />$17,572 <br />7 2" SDR 11 HDPE condensate line in common trench (jumper) <br />36,686 <br />6 <br />LF $ <br />1.55 <br />$56,864 <br />8 4" SDR 17 HOPE, single pipe in trench <br />,253 <br />LF $ <br />2.07 <br />$12,944 <br />9 4" SDR 17 HOPE, multiple lines in common trench125 <br />LF $ <br />13.89 <br />$1,737 <br />10 18" PVC Blind Flange <br />4,169 <br />LF $ <br />8.33 <br />$34,727 <br />11 4" HDPE Electro -fusion coupling <br />4 <br />$ <br />715.92 <br />$2,985 <br />12 Cut & Cap existing 2" HOPE air or condensate line (HOPE) <br />75 <br />$ <br />77.62 <br />$25,887 <br />13 Cut & Cap existing 4" HOPE well lateral (PVC) <br />$ <br />69.00 <br />$5,178 <br />14 Cut & Cap existing 18" HDPE header (PVC) <br />334 <br />EA $ <br />66.12 <br />$22,052 <br />15 Install 18" x 8" HDPE saddle (for tempora jumper <br />33 <br />$ <br />399.65 <br />$13,329 <br />16 2" PVC Mip Adapter into existing HOPE or PVC header <br />29 <br />EA $ <br />617.84 <br />$18,030 <br />17 Salvage and re -install 18" x 6" PVC Saddle/Tee @ manifold <br />29 <br />$ <br />35.50 <br />$1,036 <br />18 Salvage and re -install 18" x 6" HDPE Saddle/Tee @ manifold <br />21 <br />EA $ <br />569.08 <br />$11,862 <br />19 Salvage and re -install 18" PVC Elbow <br />13 <br />EA $ <br />512.90 <br />$6,415 <br />20 Salvage and re install 18" HDPE Flange Adapter & Hardware <br />13 <br />EA $ <br />569.08 <br />$7,117 <br />21 Salvage and re -install 18" PVC Flange &Hardware <br />4 <br />EA $ <br />256.45 <br />$1,069 <br />22 18" SDR 17 HDPE ipe in trench (as required) <br />13 <br />EA $ <br />342.03 <br />$4,278 <br />23 Salvage and re -install 18" SDR 17 HDPE in trench <br />834 <br />LF $ <br />54.21 <br />$45,199 <br />24 Salvage and re -install 18" x 14" HOPE Eccentic Reducer <br />5,420 <br />LF $ <br />45.50 <br />$246,590 <br />25 Salvage and re -install 18" SCH 40 PVC Header on i <br />P <br />42 <br />EA $ <br />256.45 <br />$10,691 <br />26 Salvage and re -install double pi support <br />27 Install double pipe support <br />P P <br />792 <br />1792 <br />LF $ <br />EA $ <br />30.95 <br />201.14 <br />$39g g84 <br />$159,321 <br />PPort <br />28 18 " PVC Schd40 Pipe on Supports <br />83 <br />EA $ <br />286.18 <br />$23,861 <br />29 Salvage and re -instal! 14" ITCFlex Hose and <br />1,251 <br />LF $ .` <br />52.43 <br />$65,572 <br />clams <br />30 Salvage and re install 18" x 14" Eccentric PVC Reducer <br />75 <br />EA $ <br />259.38 <br />$19,464 <br />31 Salvage and re -install 18" Butterfly Valve <br />117 <br />FA $ <br />342.03 <br />$39,925 <br />32 Salvage and re -install Condensate Pump Station <br />4 <br />EA $ <br />629.53 <br />$2,624 <br />33 Salvage and re -install 18" x 4" HOPE Tee (at sump) <br />4 <br />EA $ <br />2,645.00 <br />$11,027 <br />34 Salvage Covanta Ener gy piping on grade <br />EA $ <br />384.68 <br />$1,604 <br />35 Re -install Covanta Energy piping on grade <br />1 <br />LS $ <br />7,500.00 <br />$7,500 <br />36 Cut & Cap Covanta Energy Vertical Gas Extraction Well <br />1 <br />LS $ <br />13,000.00 <br />$13,000 <br />37 Extend Covanta Energy Vertical Gas Extraction Well <br />50 <br />$ <br />287.50 <br />$14,383 <br />38 Extend Condensate Pump Station <br />50 <br />$ <br />575.00 <br />$28,765 <br />39 Single Pipe Support <br />21 <br />$ <br />1,581.25 <br />$32,960 <br />40 Salvage and re -install sin le pipe support <br />9 P P PPort <br />17 <br />EA $ <br />52.03 <br />$868 <br />41 6" CSP Ste -41.62 <br />Road Crossing <br />83 <br />EA $ <br />$3,470 <br />42 Install 10" x 6" PVC saddle or tee (for temporary manifold ) <br />1.834 <br />LF $ <br />U. <br />$22,012 <br />43 8" PVC flange & hardware <br />4 <br />EA $ <br />321.14 <br />$1,339 <br />44 8" HOPE flange adapter, back-up ring, & hardware <br />4 <br />EA $ <br />335.43 <br />$1,398 <br />45 14" x 8" PVC Reducer <br />4 <br />EA $ <br />317.72 <br />$1,325 <br />46 14" PVC Elbow <br />4 <br />$ <br />730.92 <br />$3,047 <br />47 18" PVC Couplings <br />4 <br />EA $ <br />483.13 <br />$2,014 <br />48 Paint PVC Wellheads/Piping <br />625 <br />EA $ <br />313.28 <br />$195,904 <br />49 18" Electrofusion r -- ii- <br />1 <br />LS $ <br />53,000.00 <br />$53,000 <br />50 4" PVC Couplings <br />33 <br />EA $ <br />930.92 <br />$31,047 <br />51 6" PVC Couplings <br />104 <br />EA $ <br />29.27 <br />$3,051 <br />Subtotal <br />125 <br />EA $ <br />49.74 <br />$6,221 <br />5 1 Miscellaneous ah <br />$1.806.609 <br />Mobilization and demobilization included in Section 1 of Table 3. <br />Salvaged PVC header will have existing bells removed and replaced with couplings for re -installation. <br />Salvaged PVC fittings will be re -connected via installation of new couplings on both sides of fitting. <br />Salvaged PVC and HOPE pipe and fittings may require that some new replacement materials be purchased_ <br />Unit costs utilized in this attachment were obtained from recent construction bids for ongoing worklexpansion of the LFG <br />system. The material quantity were based on the 187.6 acres closure area in proportion to the closure of the Stage 1A partial <br />closure project completed in 2005 at the Forward Landfill. <br />LFySyslem Back-upSASC <br />a <br />J <br />