My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
853
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 8 <br />FORWARD LANDFILL <br />• CLOSURE COST ESTIMATE <br />SUMMARY <br />Item <br />Description <br />Estimated Unit <br />Total <br />No! <br />Quantity Price$) <br />10 <br />JENGINEERING DESIGN 4 <br />1 LS $965,560 <br />$965,560 <br />Subtotal <br />$9651560 <br />11 <br />1CONSTRUCTION MANAGEMENT 1 LS $781,200 <br />$781,200 <br />Subtotal <br />$781,200 <br />12 <br />FINAL CLOSURE AND POST -CLOSURE MAINTENANCE PLAN fg!CMP PREPARATION <br />Report Preparation - LS 1 $45,000 1 <br />$45,000 <br />Subtotal <br />$45 jA <br />Total Construction Cost <br />$20,276,768 <br />Contingenq '21r/6 <br />`$4;055;354'° <br />FCPCMP Preparation <br />$45,000 <br />..TbW-Closure Cost <br />,$24,377,.12.1 <br />Assumptions: <br />(1) Cover costs assume at least one foot of foundation material in place on the deck and slopes at closure. <br />(2) Assumes 10 percent of VFPE area (10 -foot on -center spacing). <br />(3) System to be in place prior to closure construction. <br />(4) Cost is approximately five percent of total construction cost <br />Forward Landfill PCPCMP <br />L:\Allied\2000.193\Reports\FinaIPCPCMP:cpcostest.:8/22/01 Page 2 of 2 BRYAN A. STIRRAT s ASSOUtATEE <br />
The URL can be used to link to this page
Your browser does not support the video tag.