My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
853
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />TABLE 9 <br />FORWARD LANDFILL <br />ANNUAL POST -CLOSURE MAINTENANCE AND MONITORING <br />COST ESTIMATE SUMMARY <br />Item <br />No. <br />Description <br />Quantity <br />Unit Price <br />Total <br />8 <br />VEGETATIVE COVER INSPECTION <br />Vegetation <br />Inspection <br />48 hrs <br />50 per/hr <br />$2,400 <br />Soil Quality (first 3 years only) <br />347 acres <br />25 ac <br />$8,675 <br />Rodent Control <br />96 hrs <br />50 per/hr <br />$4,800 <br />Weed Dust and Fire Control <br />180 hrs <br />30 per/hr, <br />$5,400 <br />Subtotal <br />$21,275 <br />9 <br />ACCESS ROAD MAINTENANCE <br />Inspection <br />Labor <br />24 hrs <br />50 per/hr <br />$1,200 <br />Repair <br />Labor Materials (3) <br />- <br />12,600 LS <br />$12,600 <br />Subtotal <br />$13,800 <br />10 <br />DRAINAGE CONTROL SYSTEM INSPECTION AND MAINTENANCE <br />Inspection <br />96 hrs. <br />50 per/hr <br />$4,800 <br />Repair <br />- <br />14,900 LS <br />$14,900 <br />Sedimentation Basin Silt Maintenance <br />6,700 LS <br />$6,700 <br />Subtotal <br />$26,400 <br />11 <br />SITE SECURITY INSPECTION AND MAINTENANCE <br />Labor <br />40 hrs <br />50 per/hr <br />$2,000 <br />Maintenance Re air <br />- <br />6,500 LS <br />$6,500 <br />Subtotal <br />$8,500 <br />TOTAL ANNUAL POST -CLOSURE MAINTENANCE AND MONITORING COSTS $402,225 <br />TOTAL..30.YEAR P.OST-CLOSURE MAINTENANCE.AND. MONITORING COSTS $12,066,750 <br />Notes: <br />1. Leachate. system to be decommissioned after the post -closure period. «.n.. <br />2. 0.5 percent per year of the final cover construction costs. <br />3. Assumes regrading of all access roads every five years. <br />Forward Landfill PCPCMP <br />L:\Allied\2000.193\Reports\FinaIPCPCMP:pccost:8/22/01 Page 2 of 2 <br />BRYAN A. STIRRAT 6 ASSOUTATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.