Laserfiche WebLink
Laboratory govern seam acceptance. In no case shall field testing of installed <br />seams be used for final acceptance. <br />Testing shall include peel adhesion and bonded seam strength (shear; ASTM <br />D6392). At least five specimens each shall be tested for peel and sheer. <br />Minimum test values are presented in the Specifications. The Independent <br />Testing Laboratory shall provide test results within 24 hours after receipt of <br />samples for testing. Certified test results shall be provided within 5 days. The <br />Geotechnical CQA Monitor shall document all test results on appropriate forms <br />and shall immediately notify the Geotechnical CQA Officer, Construction <br />Manager and/or Contractor/Liner Subcontractor in the event of a failed test. <br />The Contractor/Liner Subcontractor's laboratory test results shall be presented to <br />the Geotechnical CQA Officer for comments. <br />6.2.6 DEFECTS AND REPAIRS <br />6.2.6.1 Identification <br />All seams and non -seam areas of the VFPE shall be examined by the <br />Geotechnical CQA Monitors for identification of defects, holes, blisters, <br />undispersed raw materials and any sign of contamination by foreign matter. <br />Because light reflected by the VFPE helps to detect defects, the surface of the <br />VFPE shall be clean at the time of examination. The VFPE surface shall be <br />cleaned`"by`the Contractor/Liner Subcontractor if the amount of dust or mud <br />inhibits examination. <br />Each suspect location as identified by the Geotechnical CQA Monitors, both in <br />­seaTn andmon-seam-areas,-shall be non-destructively tested using the- methods <br />described herein, as appropriate. Each location which fails the nondestructive <br />testing slaall.,be marked by the...Geotechnical CQA Monitor and then-xaepaixed and <br />re -tested by the Contractor/Liner Subcontractor. Work shall not proceed with any <br />materials that will cover locations that have been repaired until laborator3r-test <br />results with passing values have been obtained. <br />6.2.6.2 Repair Procedures <br />Any portion of the VFPE with a flaw or which fails a nondestructive or <br />destructive test shall be repaired in accordance with the Specifications. The <br />Geotechnical CQA Monitor shall locate and describe all repairs on the appropriate <br />forms. Repair procedures include: <br />• Patching - used to repair large holes, tears, large panel defects, and destructive <br />sample locations that are less than 25 ft2 in total area. <br />• Extrusion - used to repair relatively small defects in panels and seams. <br />-29- <br />C:\2001-048TINAL COVER CQA.DOC\08/20/01 <br />Geologic Associates <br />