Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2003-0049 -17- <br /> FORWARD INC. AND ALLIED WASTE INDUSTRIES <br /> FOR OPERATION OF <br /> FORWARD CLASS II LANDFILL <br /> SAN JOAQUIN COUNTY <br /> c. An unsaturated zone monitoring system, consisting of a pan lysimeter shall be <br /> installed beneath the unit leachate sump. <br /> 2. The bottom liner of all new Units and lateral expansion areas of existing Units shall be <br /> constructed in accordance with the following composite liner designs: a prepared <br /> subgrade; a 24-inch thick, low-permeability soil layer(minimum permeability of 1 X 10"7 <br /> cm/sec); a 60-mil high density polyethylene(HDPE) geomembrane; a 12-ounce/square <br /> yard cushion geotextile (may be omitted if the LCRS gravel is sub-angular to rounded); a <br /> 12-inch LCRS gravel drainage layer; an 8-ounce/square yard separator geotextile; and a <br /> 12-inch thick protective cover soil operations layer. The side slope liner of all new Units <br /> and later expansion areas of existing Units shall be constructed in accordance with the <br /> following composite liner design: a prepared subgrade; a GCL or a 24-inch thick low <br /> permeability soil layer(minimum permeability of the soil 1 X 10"7 cm/sec); a <br /> geocomposite drainage net; and a 12-inch thick protective cover soil operations layer. <br /> 3. The Discharger may propose changes to the liner system design prior to construction, <br /> provided that approved components are not eliminated,the engineering properties of the <br /> components are not substantially reduced, and the proposed liner system results in the <br /> protection of water quality equal to or greater than the design prescribed by Title 27 and <br /> this Order. The proposed changes may be made following approval by the Executive <br /> Officer. Substantive changes to the design require reevaluation as an engineered <br /> alternative and approval by the Board. <br /> 4. If the Discharger proposes to construct a liner system in which a GCL is placed on top of <br /> a subgrade, the subgrade for the bottom and the side slopes of the Unit shall be prepared <br /> in an appropriate manner using accepted engineering and construction methods so as to <br /> provide a smooth surface that is free from rocks, sticks, or other debris that could damage <br /> or otherwise limit the performance of the GCL. <br /> 5. Construction shall proceed only after all applicable construction quality assurance plans <br /> have been approved by Executive Officer. <br /> 6. Following the completion of construction of a Unit or portion of a Unit, and prior to <br /> discharge onto the newly constructed liner system,the final documentation required in <br /> §20324(d)(1)(C) of Title 27 shall be submitted to the Executive Officer for review and <br /> approval. The report shall be certified by a registered civil engineer or a certified <br /> engineering geologist. It shall contain sufficient information and test results to verify that <br /> construction was in accordance with the design plans and specifications, and with the <br /> prescriptive standards and performance goals of Title 27. Testing shall include a liner <br /> leak detection test conducted after installation of the drainage layer and the operations <br /> layer. <br />