My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002 - JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002 - JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:46:56 PM
Creation date
7/3/2020 10:48:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002 - JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
953
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FORWARD <br />COST ESTIMATE SUMMAR <br />CLOSURE0 187.6 -ACRE <br />n <br />Notes: <br />(1) The unit costs for the synthetic final cover materials and installation, drainage control system features and erosion control are <br />based on a recent bid (May 2008) prepared by Boston Pacific, Inc for remediation and closure work at the Jamestown Landfill located <br />in the same general region (See Attachment No. 1). <br />(2) Unit costs includes excavation, preparation and compaction of the foundation and vegetative layers. Earthwork pricing is based <br />on a recent bid provided by Guinn Construction to Allied for their last lined cell to be constructed in 2008 (See Attachment No. 1). Cost <br />also assumed that all materials necessary for the foundation, low -permeable and vegetative layers will be obtained from an on-site <br />borrow source. Cost also assumes 50% of total final area as slope and a slope factor of 3:1 horizontal to vertical. <br />(3) Cost assumes that only one foot of random soil would need to be placed for the foundation layer because one -foot of soil would <br />already be in place. Cost also assumes scarification and recompaction of the lower in-place foot of soil as part of the preliminary <br />grading cost item. <br />(4) Final cover construction quality assurance (CQA) is generally based on the actual number of construction days to complete the <br />cap. Based on the closure implementation schedule, approximately 130 construction days will be needed to install the final cover over <br />the 187.6 -acre closure area. The per day CQA utilized for this estimate was provided by one of Allied's professional CQA consultants <br />(Geologic Associates). The per day cost for a CQA professional, equipment, and vehicle is $1,500. Laboratory sampling and testing <br />is based on quantities of final cover soil and synthetic in accordance with the sampling/testing frequency outlined in the CQA Plan in <br />the 2002 PCPCMP and current regulations under 27CCR and the cost per test provided by Geologic Associates for earthwork and <br />Precision Labs for synthetics. Geosynthetic testing frequencies are established by the Geosynthetic Research Institute and are <br />completed at rate of 1 test every 100,000 sq ft. Laboratory costs are estimated to be $218,433. In addition, the final CQA report <br />certifying proper installation of the cap is another $20,000. <br />(5) All on-site structures associated with the landfill will be removed. An administration/maintenance office trailer, as well as an <br />equipment maintenance area, will be utilized during the post -closure maintenance period. <br />(6) No cost is included in this category because the system is/will be in-place at closure. Currently, there are no plans to expand <br />the monitoring system. <br />(7) Cost is for engineering design and preparation of construction documentation (plans and specifications) for bid purposes. <br />(8) Cost is for monitoring contractors worts, coordinating CQA activities, meetings, liaison between design engineers and <br />contractors, etc. <br />Forward Landfill PCPCMPR <br />Z:\PROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\JRBTable3 Clos Cst; Revision 1: 7/10/2008 Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.