Laserfiche WebLink
• <br />• <br />Attachment 1 <br />Final Closure Construction Cost Estimate for the Jamestown Landfill - 2008 <br />Z:\PROJECTS\Allied Waste\Forward\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\13oston Pacific <br />Boston Pacific, Inc. <br />Item <br />No. <br />Item <br />Unit <br />Est. Qty <br />Unit Price <br />Total <br />28 <br />Construct Geocomposite Tie -In to <br />LF <br />1,600 <br />$48.30 <br />$77,280.00 <br />Draina e System 6 -inch <br />29 <br />Construct Geocomposite Tie -In to <br />LF <br />6,800 <br />$33.70 <br />$229,160.00 <br />Drainage System 4 -inch <br />30 <br />Prepare, Place and Compact <br />CY <br />S8,864 <br />$12.80 <br />$753,459.20 <br />Vegetative Soil Layer <br />31 <br />Construct Access Roads <br />LF <br />3,400 <br />$8.30 <br />$28,220.00 <br />Hydroseed and Permanent Erosion <br />ACRE <br />18 <br />$4,630.00 <br />$83,340.00 <br />Control <br />33 <br />Install Survey Monuments <br />EA <br />4 <br />$1,520.00 <br />$6,080.00 <br />34 <br />Construct V -Ditch Type 1(Concrete) <br />LF <br />3,400 <br />$26.30 <br />$89,420.00 <br />Construct V -Ditch Type 2 (Concrete) <br />LF <br />1,700 <br />$38.50 <br />$65,450.00 <br />36 <br />Construct V -Ditch Type 3 (Ri ra) <br />LF <br />2,000 <br />$17.40 <br />$34,800.00 <br />37 <br />Drainage Inlets for Storm Drains 2, 3, <br />EA <br />3 <br />$2,000.00 <br />$6,000.00 <br />5 <br />38 <br />Drainage Inlets for Storm Drains 1, 4, <br />EA <br />4 <br />$1,840.00 <br />$7,360.00 <br />67 <br />39 <br />Drainage Inlets for Storm Drains 8, 9 <br />EA <br />2 <br />$1,990.00 <br />$3,980.00 <br />40 <br />Construct Western Outlet Structure <br />LS <br />1 <br />$6,200.00 <br />$6,200.00 <br />and Apron <br />41 <br />Construct SE Basin Inlet and Riprap <br />LS <br />1 <br />$4,540.00 <br />$4,540.00 <br />Apron <br />42 <br />Construct SE Basin Outlet Structure <br />LS <br />1 <br />$5,100.00 <br />$5,100.00 <br />and Ri rap Apron <br />43 <br />Construct Upper Northern Outlet and <br />LS <br />1 <br />$1,370.00 <br />$1,370.00 <br />Riprap Apron <br />44 <br />Construct Lower Northern Outlet and <br />LS <br />1 <br />$1,370.00 <br />$1,370.00 <br />Riprap Apron <br />Drainage Pipe, 24 -inch HDPE <br />LF <br />70 <br />$46.10 <br />$3,227.00 <br />46 <br />Drainage Pipe, 18 -inch HDPE <br />LF <br />430 <br />$33.90 <br />$14,577.00 <br />47 <br />Drainage Pipe, 12 -inch HDPE <br />LF <br />480 <br />$23.00 <br />$11,040.00 <br />TOTAL A <br />$4,749,827.71 <br />Highlighted items unit prices were utilized for the Forward Landfill Closure Cost Estimate Table 3 of PCPCMP <br />Amendment No. 3. Information obtained from Sukut Construction, one of the bidders on this Public Works <br />project. This information was submitted in the form of a construction bid estimate to remediate and close the <br />Jamestown Landfill, Tuolumne County. <br />Z:\PROJECTS\Allied Waste\Forward\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\13oston Pacific <br />