Laserfiche WebLink
x I I Iii i['T*T51114KQZ1 <br />The Stage IA partial closure of the Forward Landfill will be performed in <br />accordance with the applicable regulatory standards included in 27 CCR, <br />Chapters 3 and 4 and 40 CFR, Subpart F. The costs associated with the <br />closure of Stage IA are described in Section 6.0 of this document. The <br />improvements and systems required for the closure of Stage IA include the <br />final cover and final grading plan, supported by landfill settlement and slope <br />stability analyses, drainage and erosion control systems, landfill gas control <br />and monitoring systems, groundwater/surface water monitoring system, and <br />decommissioning of environmental control systems. A description of these <br />closure improvements as well as a schedule for construction is presented in <br />the following subsections. <br />3.2 FINAL COVER <br />The purpose of a final cover is to provide long-term minimization of surface <br />water intrusion, to isolate wastes from the ground surface, and to reduce the <br />potential for odors and gas emissions. The cover also provides a base for <br />vegetation, which will reduce drainage velocities and erosion. In addition, the <br />final cover configuration is designed to accommodate settlement, subsidence <br />and the effects of seismic events throughout the minimum 30 -year post - <br />closure maintenance period and beyond. <br />3.2.1 FINAL COVER DESIGN <br />3.2.1.1 REGULATORY DESIGN STANDARDS <br />California Final Cover Prescriptive Design Standard <br />The minimum final cover standards for the Forward Landfill, as outlined in the <br />closure and post -closure requirements for Class II landfills contained in 27 CCR, <br />Section 21090 include: <br />• Foundation Laver: A minimum two -foot thick layer of soil placed <br />immediately over the entire surface of the last lift of refuse. This layer <br />Forward Landfill PFCPCMP 3-1 <br />Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec3.doc: 6/16/2008 <br />