My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002 - JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002 - JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:46:56 PM
Creation date
7/3/2020 10:48:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002 - JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
953
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
buried horizontal gas collector, and below grade laterals connected to a <br />series of vertical gas extraction wells. All LFG collected from this system is <br />routed to LFG-to-energy power plant owned and operated by Covanta <br />Energy. Landfill gas not utilized by the power generation facility will be <br />collected, conveyed and incinerated at the flare station. The flare station <br />location is identified on Figure 3. <br />A portion of the Covanta Energy LFG extraction system will be taken off-line <br />to allow for grading activities. To keep the power plant operational, <br />temporary laterals from the primary LFGES system will be routed to the <br />Covanta Energy header to supplement their fuel requirements. Once the <br />Covanta LFG extraction system is re -installed, the temporary laterals will be <br />removed or abandoned in-place. <br />In order to integrate the gas control system in the Stage IA partial closure <br />area with the final cover, the following procedures are proposed for closure <br />construction. <br />Prior to placement of the final cover, the header system will be removed in <br />phases, as shown in the gas system Drawing Sheets G-1 through G-14, to <br />minimize interruption of the gas system operation. The gas header, <br />compressed air, and condensate conveyance lines will be re -installed and <br />made operational prior to removal of the next phase. Any affected wells will <br />be disconnected prior to removal of the header. Headers will be re -installed if <br />the integrity of the pipe remains intact and if it can be adjusted to a positive <br />grade. Otherwise, the pipelines will be replaced. The main header system <br />will remain on-line during the entire construction period. <br />All vertical gas collection wells in place in the Stage IA partial closure area will <br />be protected during the placement of the final cover since control of landfill <br />gas will continue during cover construction. The top of the vertical wells or <br />well laterals will be extended through the final cover and then reconnected to <br />the perimeter header system line as before. Any damaged or non-functional <br />vertical wells or laterals will be abandoned and new replacements installed to <br />provide gas extraction coverage. Final cover material will be placed and <br />compacted by hand around the wells or vaults to protect against damage by <br />earthmoving equipment. In order to keep the gas system operational during <br />Forward Landfill PFCPCMP 3-15 <br />ZAP ROJ ECTS\Al lied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec3.doc: 6/16/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.