Laserfiche WebLink
buried horizontal gas collector, and below grade laterals connected to a <br />series of vertical gas extraction wells. All LFG collected from this system is <br />routed to LFG-to-energy power plant owned and operated by Covanta <br />Energy. Landfill gas not utilized by the power generation facility will be <br />collected, conveyed and incinerated at the flare station. The flare station <br />location is identified on Figure 3. <br />A portion of the Covanta Energy LFG extraction system will be taken off-line <br />to allow for grading activities. To keep the power plant operational, <br />temporary laterals from the primary LFGES system will be routed to the <br />Covanta Energy header to supplement their fuel requirements. Once the <br />Covanta LFG extraction system is re -installed, the temporary laterals will be <br />removed or abandoned in-place. <br />In order to integrate the gas control system in the Stage IA partial closure <br />area with the final cover, the following procedures are proposed for closure <br />construction. <br />Prior to placement of the final cover, the header system will be removed in <br />phases, as shown in the gas system Drawing Sheets G-1 through G-14, to <br />minimize interruption of the gas system operation. The gas header, <br />compressed air, and condensate conveyance lines will be re -installed and <br />made operational prior to removal of the next phase. Any affected wells will <br />be disconnected prior to removal of the header. Headers will be re -installed if <br />the integrity of the pipe remains intact and if it can be adjusted to a positive <br />grade. Otherwise, the pipelines will be replaced. The main header system <br />will remain on-line during the entire construction period. <br />All vertical gas collection wells in place in the Stage IA partial closure area will <br />be protected during the placement of the final cover since control of landfill <br />gas will continue during cover construction. The top of the vertical wells or <br />well laterals will be extended through the final cover and then reconnected to <br />the perimeter header system line as before. Any damaged or non-functional <br />vertical wells or laterals will be abandoned and new replacements installed to <br />provide gas extraction coverage. Final cover material will be placed and <br />compacted by hand around the wells or vaults to protect against damage by <br />earthmoving equipment. In order to keep the gas system operational during <br />Forward Landfill PFCPCMP 3-15 <br />ZAP ROJ ECTS\Al lied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec3.doc: 6/16/2008 <br />