My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002 - JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002 - JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:46:56 PM
Creation date
7/3/2020 10:48:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002 - JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
953
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 3.13 <br />CLOSURE r <br />3.13.1 CLOSURE PROCESS <br />As discussed in Section 1.5, Stage IA of the Forward Landfill will be closed in <br />Summer 2005. Stage IA closure construction will begin with mobilization of <br />equipment and materials. The type of equipment and required personnel <br />expected to be utilized during closure construction includes but is not limited <br />to, the following: <br />• Equipment <br />Scrapers <br />Dozers <br />Loaders <br />Compactors <br />Trucks <br />Soil Screening Equipment <br />Motor Grader <br />Water Truck <br />• Personnel <br />Construction Manager <br />Field Inspector(s) <br />Engineer(s) <br />Geotechnical Engineer/Geologist <br />Geotechnical Technician(s) <br />Labor Crews <br />Equipment Operators <br />Surveyors <br />_ Mechanics <br />3.13.2 CONSTRUCTION SCHEDULE <br />The AVSL closure construction schedule includes the following tasks <br />conducted over the corresponding time lines: <br />• Equipment Mobilization 2 weeks <br />• Interim/Foundation Layer Preliminary Grading 1-1/2 weeks <br />• Placement of Monolithic Cover Layer 8 weeks <br />• Drainage Control Systems Construction 5 weeks <br />• Survey/Settlement Monument Installation 1 week <br />• French Drain Leachate Seep Collector Installation 2 weeks <br />Forward Landfill PFCPCMP 3-17 <br />Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec3.doc: 6/16/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.