Laserfiche WebLink
Leachateuanti and quality will be monitored at least quarterly or whenever <br />q tY q tY <br />groundwater samples are collected. The volume of leachate collected by the <br />french drain shall be measured and recorded at least quarterly. Representative <br />samples of leachate and any fluid recovered in the french drain system will be <br />tested for the same chemical parameters as required by the groundwater <br />monitoring program. Reports will be filed with the LEA, CIWMB and the <br />RWQCB within 90 days of sampling. <br />4.6 BENCH MAINTENANCE <br />The bench will require general maintenance. After a significant storm event <br />and on a quarterly basis, the bench will be inspected to determine if any <br />potholing, erosion and/or structural damage has occurred. If any deficiencies <br />are noted, the affected area will be repaired. <br />4.7 LANDFILL SETTLEMENT MONITORING AND MONUMENT <br />• 4.7.1 SURVEY RECORD <br />Regulatory requirements dictate that, upon completion of closure construction <br />activities, a survey record of the closed landfill be established and recorded <br />with the title of the property, with the County Recorders office and copies be <br />made available to the CIWMB, LEA and kept on-site at the administration <br />offices. The survey of record will include the following information: <br />The date closure construction was completed; <br />• Boundaries of the disposal area; <br />• The location and telephone number of where the closure and post -closure <br />plans can be obtained; and <br />• A statement that the future site use is restricted in accordance with the <br />post -closure maintenance plan. <br />4.7.2 SURVEY/SETTLEMENT MONUMENTS <br />0 In accordance with 27 CCR, Section 20950 (d), survey/settlement <br />Forward Landfill PFCPCMP 4-3 <br />Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec4.doc: 6/16/2008 <br />