My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002 - JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002 - JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:46:56 PM
Creation date
7/3/2020 10:48:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002 - JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
953
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />• After the drainage problem is corrected, an assessment of possible <br />damage or erosion will be conducted and all necessary repairs will be <br />made. <br />If the emergency is due to a flood that is from a 100-year/24-hour storm <br />event or less, this is an indication that the drainage and flood protection <br />design for the facility may be inadequate. A design review shall be <br />performed and, if appropriate, all necessary modifications to drainage and <br />flood protection facilities will be made. <br />* <br />The following procedures will be performed following an earthquake incident: <br />• Employees driving in the field during an earthquake should stop their <br />vehicle and get out, if it can be done in a safe manner. <br />• After the earthquake has subsided, site personnel shall report to the site <br />entrance gate for a roll call. If medical care is required, the procedures in <br />Section 5.10 shall be followed. An inspection of the site shall then be <br />made and a report given to the SSO. <br />• Cracks observed in the final cover after an earthquake should be <br />inspected with a combustible gas analyzer. The location of venting and <br />the gas concentrations will be determined and reported to the SSO. <br />Excavation and refill of the smaller surface cracks can be completed <br />immediately. More extensive corrective actions will be authorized by the <br />Site Engineer in accordance with the CQA Plan included in Appendix C of <br />Appendix A. <br />• If a slope fails due to an earthquake, a design review shall be performed <br />for conformance with design standards established at closure and, if <br />appropriate, all necessary modifications to the landfill's slope design will <br />be made. <br />:41-1101:411191 :If_ -I <br />•: <br />In the event of a surface drainage problem, the following procedures shall be <br />followed: <br />• The operator will investigate the problem and determine a necessary <br />course of action. <br />Forward Landfill FPCPCMP 5-4 <br />Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec 5.doc: 6/16/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.