Laserfiche WebLink
U <br />• After the drainage problem is corrected, an assessment of possible <br />damage or erosion will be conducted and all necessary repairs will be <br />made. <br />If the emergency is due to a flood that is from a 100-year/24-hour storm <br />event or less, this is an indication that the drainage and flood protection <br />design for the facility may be inadequate. A design review shall be <br />performed and, if appropriate, all necessary modifications to drainage and <br />flood protection facilities will be made. <br />* <br />The following procedures will be performed following an earthquake incident: <br />• Employees driving in the field during an earthquake should stop their <br />vehicle and get out, if it can be done in a safe manner. <br />• After the earthquake has subsided, site personnel shall report to the site <br />entrance gate for a roll call. If medical care is required, the procedures in <br />Section 5.10 shall be followed. An inspection of the site shall then be <br />made and a report given to the SSO. <br />• Cracks observed in the final cover after an earthquake should be <br />inspected with a combustible gas analyzer. The location of venting and <br />the gas concentrations will be determined and reported to the SSO. <br />Excavation and refill of the smaller surface cracks can be completed <br />immediately. More extensive corrective actions will be authorized by the <br />Site Engineer in accordance with the CQA Plan included in Appendix C of <br />Appendix A. <br />• If a slope fails due to an earthquake, a design review shall be performed <br />for conformance with design standards established at closure and, if <br />appropriate, all necessary modifications to the landfill's slope design will <br />be made. <br />:41-1101:411191 :If_ -I <br />•: <br />In the event of a surface drainage problem, the following procedures shall be <br />followed: <br />• The operator will investigate the problem and determine a necessary <br />course of action. <br />Forward Landfill FPCPCMP 5-4 <br />Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec 5.doc: 6/16/2008 <br />