C7 <br />TABLE 6 <br />FORWARD LANDFILL <br />CLOSURE COST ESTIMATE SUMMARY <br />STAGE IA PARTIAL CLOSURE AREA <br />ESTIMATED <br />ITEM DESCRIPTION QUANTITY UNIT PRICE COST <br />11 1 ENGINEERING DESIGN (4) <br />1 Is $85,000 $85,000 <br />Subtotal $85,000 <br />12 CONSTRUCTION MANAGEMENT (5) <br />4% of construction cost) 1 Is $73,692' <br />Subtotal $73,692 <br />Total Construction Cost $2,107,483 <br />Contingency 20% $421,497 <br />Total Closure Cost Estimate $2,528,980 <br />Notes: <br />(1) Costs for preparation and compaction of the existing one foot of foundation is included in this item. <br />(2) Cost assumes that only one foot of random soil would need to be placed for the foundation layer because one <br />foot of soil would already be in place. <br />(3) No cost is included in this category because the system is currently in-place and/or no modification is required <br />as part of the Stage IA partial closure. <br />(4) Cost is for engineering design and preparation of construction documentation (plans and specifications) for <br />bid purposes. <br />(5) Cost is for monitoring contractors work, coordinating CQA activities, meetings, liaison between design <br />engineers and contractors, etc. <br />Forward landfill PCPCMPR <br />Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\Tables\ClosCst; Revision 1: 6/1612008 Page 2 of 2 <br />