My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002 - JTD
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002 - JTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 12:46:56 PM
Creation date
7/3/2020 10:48:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002 - JTD
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
953
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C7 <br />TABLE 6 <br />FORWARD LANDFILL <br />CLOSURE COST ESTIMATE SUMMARY <br />STAGE IA PARTIAL CLOSURE AREA <br />ESTIMATED <br />ITEM DESCRIPTION QUANTITY UNIT PRICE COST <br />11 1 ENGINEERING DESIGN (4) <br />1 Is $85,000 $85,000 <br />Subtotal $85,000 <br />12 CONSTRUCTION MANAGEMENT (5) <br />4% of construction cost) 1 Is $73,692' <br />Subtotal $73,692 <br />Total Construction Cost $2,107,483 <br />Contingency 20% $421,497 <br />Total Closure Cost Estimate $2,528,980 <br />Notes: <br />(1) Costs for preparation and compaction of the existing one foot of foundation is included in this item. <br />(2) Cost assumes that only one foot of random soil would need to be placed for the foundation layer because one <br />foot of soil would already be in place. <br />(3) No cost is included in this category because the system is currently in-place and/or no modification is required <br />as part of the Stage IA partial closure. <br />(4) Cost is for engineering design and preparation of construction documentation (plans and specifications) for <br />bid purposes. <br />(5) Cost is for monitoring contractors work, coordinating CQA activities, meetings, liaison between design <br />engineers and contractors, etc. <br />Forward landfill PCPCMPR <br />Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\Tables\ClosCst; Revision 1: 6/1612008 Page 2 of 2 <br />