Laserfiche WebLink
C7 <br />TABLE 8 <br />FORWARD LANDFILL STAGEAREA <br />ANNUAL POST -CLOSURE OCOST ESTIMATE SUMMARY <br />- <br />Item <br />No. <br />Description <br />Quantity <br />Unit Price <br />($� <br />Total 71 <br />($) <br />1 <br />FINAL COVER INSPECTION/MAINTENANCE AND REPAIR <br />Ins ection <br />12 hrs <br />50per/hr <br />$600 <br />Cover Re air <br />- <br />5,000 LS <br />$5,000 <br />Subtotal <br />$5,600 <br />2 <br />LANDFILL SETTLEMENT MONITORING AND MONUMENT MAINTENANCE <br />Inspection/Maintenance <br />Labor <br />8 hrs <br />50 er/hr <br />$400 <br />Materials $900 to replace every 3 ears <br />- <br />300 LS <br />$300 <br />Aerial Survey Once eve 5 ears $14,000/5 r <br />- <br />2,800 LS <br />$2,800 <br />Settlement Report <br />Engineer <br />10 hrs <br />105 2er/hr <br />$1,050 <br />Labor <br />6 hrs <br />50per/hr <br />$300 <br />Subtotal <br />$4,850 <br />3 <br />VEGETATIVE COVER INSPECTION <br />Vegetation <br />Inspection <br />4 hrs <br />50per/hr <br />$200 <br />Soil Quality first 3 years only) <br />29 acres <br />25 ac <br />$725 <br />Rodent Control <br />8 hrs <br />50per/hr <br />$400 <br />Weed/Dust and Fire Control <br />16 hrs <br />30per/hr <br />$480 <br />Subtotal <br />$1,805 <br />4 <br />BENCH MAINTENANCE <br />Inspection <br />Labor <br />4 hrs <br />50per/hr <br />$200 <br />Repair <br />Labor/Materials <br />- <br />2,000 LS <br />$2,000 <br />Subtotal <br />$2,200 <br />5 <br />FRENCH DRAIN LEACHATE SEEP COLLECTORS MAINTENANCE/MONITORING <br />Inspection and Maintenance <br />- <br />400 LS <br />$400 <br />Leachate Sampling/Analysis <br />- <br />200 LS <br />$200 <br />Subtotal <br />$600 <br />6 <br />DRAINAGE CONTROL SYSTEM INSPECTION AND MAINTENANCE <br />Ins ection <br />8 hrs. <br />50per/hr <br />$400 <br />Repair <br />- <br />1,500 LS 1 <br />$1,500 <br />Subtotal <br />$1,900 <br />TOTAL ANNUAL POST -CLOSURE MAINTENANCE AND MONITORING COSTS $16,955 <br />TOTAL 30 YEAR POST -CLOSURE MAINTENANCE AND MONITORING COSTS <br />Forward Landfill PCPCMP <br />L: W (lied\2000.193\Reports\FinaIPCPCMP:flpccost:6/16/2008 <br />